General Inspection | 6/17/2020 | 6/19/2020 | 6/22/2020 | P | PASS |
Michael Zawacki
|
|
|
WIP on grading and site work. No dust or trackout.
|
Site Preparation | 3/10/2020 | 3/11/2020 | 3/11/2020 | P | PASS |
Michael Zawacki
|
|
|
Met with reps from ESI and prime contractor. 2 parts to job. 1. New access, extended parking lot and will replace asphalt with concrete. Roof overhangs will be extended.. 2. New parking lot. Site will be below grade of surrounding area. Knife river is doing work. Installing entrance while I was on site. Silt fence scheduled to be installed. Biggest concerns for sites will be track out and blowing dust.
|
Issue & PRINT permit COM | | | 3/6/2020 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 3/6/2020 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 12/31/2019 | | 12/31/2019 | | DONE |
Michael Zawacki
|
|
|
Site prep required.
|
Application received | | | 12/26/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 26 2019 8:44PM
|