Site Preparation | 7/14/2020 | 7/14/2020 | 7/14/2020 | P | PASS |
Michael Zawacki
|
|
|
Met with GC. Concerns will be dust and trackout. Site has water meter or will bring truck to spray as needed. 2 inlets over canal will be protected.
|
Issue & PRINT permit COM | | | 7/13/2020 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 2/11/2020 | | 2/11/2020 | | DONE |
Michael Zawacki
|
|
|
RP needed. Site prep required. Plan ok due to nonenviromental location.
|
Application received | | | 12/31/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 31 2019 10:43AM
|