General Inspection | 7/16/2020 | 8/4/2020 | 8/4/2020 | P | PASS |
Michael Zawacki
|
|
|
ZCurrent perimeter trench work, looks like it is for water lines. All excavated material on site. Staging for building is in rear, site is clean and contained.
|
Site Final | 7/17/2020 | 7/17/2020 | 7/17/2020 | P | PASS |
Andy J. Long
|
|
|
See ESC20-01159. This project complete. BLD still open
|
Site Preparation | 7/16/2020 | 7/16/2020 | 7/16/2020 | P | PASS |
Andy J. Long
|
|
|
Dillon - */Screened*/ Phone #: ###-####
Initial BMPs installed including construction entrance, SWPPP signage, and storm drain inlet sediment protection.
Will use ecopan for concrete washout and there is a water truck onsite to control fugitve dust.
Approved.
|
General Inspection | 6/22/2020 | 6/22/2020 | 6/22/2020 | P | PASS |
Michael Zawacki
|
|
|
No workers on site. Area has been stripped, does not look graded. Large stockpile on rear of site, water truck parked on site. Storage tank on site not affected. No issues,
|
Site Preparation | 1/27/2020 | 1/27/2020 | 1/27/2020 | P | PASS |
Andy J. Long
|
|
|
Modular building. No trackout, no activity at time of inspection. Muddy condition around building. Storm drains on Kennedy have sediment bags installed.
|
Permit Ready to Issue | | | 1/22/2020 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 1/22/2020 | | DONE |
|
|
|
|
Application received | | | 1/16/2020 | | |
|
|
|
|
Routing - Erosion and Sediment | 1/16/2020 | | 1/16/2020 | | DONE |
Michael Zawacki
|
|
|
Waiver approved. Initial site permit issued under GRD19-00057.
|