Complaint Inspection | 6/1/2020 | 6/1/2020 | 6/1/2020 | P | PEND |
Andy J. Long
|
|
|
dust complaint
No significant dust at time of inspection. Two excavators working to place drain rock in new seepage beds. Some dust occurning, no plumes Will follow up on stockpile stabilization. WIP by.
|
Complaint Inspection | 5/8/2020 | 5/8/2020 | 5/13/2020 | P | PEND |
Andy J. Long
|
|
|
Notified Granite Excavation to clean up all loose dirt on hard surfaces and have water truck onsite to control dust during dust generating activities.
|
Permit Ready to Issue | | | 2/19/2020 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 2/19/2020 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 2/19/2020 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 1/29/2020 | | 1/29/2020 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Perryman Construction needs to provide name of certified Responsible Person. Site preparation inspection is required.
|
Application received | | | 1/22/2020 | | |
|
|
|
|