General Inspection | 8/7/2020 | 8/7/2020 | 8/7/2020 | P | PASS |
Michael Zawacki
|
|
|
Exterior work, parking lot, and landscaping completed. Job trailer and material storage has moved to south lot.
|
General Inspection | 7/7/2020 | 7/7/2020 | 7/7/2020 | P | PASS |
Michael Zawacki
|
|
|
WIP on building exterior. Parking lot and drive through paved and curbing completed, washout pan at site. Large dumpster, no loose trash. No issues at site.
|
General Inspection | 6/2/2020 | 6/2/2020 | 6/2/2020 | P | PASS |
Michael Zawacki
|
|
|
WIP on framing, no building waste around site. Plan on pouring curbing next week, will have washout pan replaced before pour. Water wagon on site for dust control, no tracking.
|
Tracking Control | 4/27/2020 | 4/27/2020 | 4/27/2020 | P | FAIL |
Michael Zawacki
|
|
|
Met with PM and Radix who is doing dirt work. Tracking will be cleaned.
|
Site Preparation | 4/17/2020 | 4/17/2020 | 4/20/2020 | P | PASS |
Michael Zawacki
|
|
|
wip. wALKED SITE WITH FOREMAN. fOUNDATION POURED, WASHOUT IS USE. Ask them to make sure and use water for dust control, inlet on wildwood needs di bag installed. All workers are parked on street. No trackout, rock entrance installed, not crushed rock.
|
Site Preparation | 4/9/2020 | 4/9/2020 | 4/17/2020 | P | CANC |
Andy J. Long
|
|
|
|
Permit Ready to Issue | | | 4/6/2020 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 4/6/2020 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 2/11/2020 | | 2/11/2020 | | DONE |
Michael Zawacki
|
|
|
Site prep required.
met RP JCA.
|
Application received | | | 1/28/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 28 2020 3:03PM
|