General Inspection | 7/17/2020 | 7/17/2020 | 7/20/2020 | P | PASS |
Michael Zawacki
|
|
|
Work area has well point, no standing surface water. Footings for observation deck poured. Water discharge is onto dry area and is clean. Discharge does become concentrated and flows into thick brush, unable to trace to discharge point. Storage area is to south of work area on greenbelt. No dirt or dirty discharge in water.
|
General Inspection | 6/9/2020 | 6/18/2020 | 6/18/2020 | P | PEND |
Michael Zawacki
|
|
|
Site has dewatering well point and pump, not running at time of inspection. Outlet goes straight to creek. Will need to investigate as to if they submitted a plan and what their testing protocal is. Section of creek along greenbelt is diverted to culvert and has road built over it. No issues with crossing, no plumes in creek flow at culvert exits.
|
Site Preparation | 6/4/2020 | 6/4/2020 | 6/9/2020 | P | PASS |
Andy J. Long
|
|
|
Initial BMPs installed. Coffer dam and pipe working well to bypass Walling Creek water through work area. Will be extending the 12" pipe for culvert to extend through entire area.
Notified site about requirement for concrete washout.
Approved for construction, posted ESC permit sign. Follow up scheduled
|
Permit Ready to Issue | | | 6/2/2020 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 6/2/2020 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 2/27/2020 | | 2/27/2020 | | DONE |
Michael Zawacki
|
|
|
Site prep inspection required. Inspection and approval needed before any dewatering.
|
Application received | | | 1/29/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 29 2020 9:19AM
|