Site Preparation | 4/21/2020 | 4/22/2020 | 4/23/2020 | P | PASS |
Andy J. Long
|
|
|
Permit posted. Parking lot storm drains have sediment protection. Construction entrance and road mix access to new building site west of the existing building.
Approved.
|
General Inspection | 4/6/2020 | 4/6/2020 | 4/6/2020 | P | PART |
Michael Zawacki
|
|
|
SIte still needs a site prep. Looks like water lines for sewer have been run. There is an access along souther perimeter. Crews on site doing some prep work, play groung equipment has been disassembled and is on flat bed.
|
Issue & PRINT to be Invoiced | | | 3/23/2020 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 2/10/2020 | | 2/10/2020 | | DONE |
Michael Zawacki
|
|
|
Site prep inspection required.
|
Application received | | | 2/3/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 3 2020 11:52AM
|
Fees Due Hold | 3/24/2020 | | | | |
|
|
|
|