General Inspection | 3/5/2020 | 3/25/2020 | 3/25/2020 | P | CANC |
Andy J. Long
|
|
|
check on site mobilization
|
Site Preparation | 3/5/2020 | 3/5/2020 | 3/5/2020 | P | PASS |
Andy J. Long
|
|
|
12 noon meeting Boise Parks Rec RP Kelly and contractors Cutting Edge and out of state tennin court installer.
Project to begin staging and installing perimeter fence in approximately 10 days.
Main BMPs to be implemented: - designated clearing limits - access behind the West YMCA dirtectly onto court area. Will have broom for trackout - above ground concrete washout pan - will have water for dust control - post ESC permit sign - contain trash and have spill clean up materials on hand.
Approved. Follow up scheduled
|
Issue & PRINT to be Invoiced | | | 3/4/2020 | | DONE |
|
|
|
|
Telephone call | | | 3/4/2020 | | DONE |
|
|
|
Permit has been printed and is waiting for a signature. Please make sure it is signed before issuing.
|
Application received | | | 2/28/2020 | | |
|
|
|
|
Routing - Erosion and Sediment | 2/28/2020 | | 2/28/2020 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Certified RP listed. Site preparation inspection required.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/28/2020 | | |
|
|
|
|