General Inspection | 5/11/2020 | 5/11/2020 | 5/11/2020 | P | PASS |
Michael Zawacki
|
|
|
Met builder on site. Has just started working on framing, has steel being coming soon. Backfill scheduled to be replaced. Site is clean.
|
Site Preparation | 3/30/2020 | 3/31/2020 | 3/31/2020 | P | PASS |
Michael Zawacki
|
|
|
Perimeter wattles installed. Excavation has begun, all backfill contained on site, pile is close to sidewalk, none getting on it. Installed permit while at site.
|
Issue & PRINT permit SFD | | | 3/24/2020 | | DONE |
|
|
|
|
(F) Reprint permit | | | 3/24/2020 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 3/10/2020 | | 3/10/2020 | | DONE |
Michael Zawacki
|
|
|
SIte prep inspection required.
|
Application received | | | 3/2/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 2 2020 3:39PM
|