DOC - Permit Finaled | 7/16/2020 | 7/16/2020 | 7/16/2020 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 3/24/2020 | 3/24/2020 | 3/24/2020 | P | FAIL |
Michael Zawacki
|
|
|
Knife river truck washed out onto ground, lined washout on site, was used by IMC truck. Lots of dirt from backfill on sidewalks. Knife river doing site prep on far south of site. Road is not paved to south cole. Heavy equipment is running throughout site. Multiple homes under construction on western perimeter. No homes have begun on north side. Culdesac curbing completed, not paved. Multiple phases of construction under multiple permits. Lots of overlap, site getting same inspection report for all permits.
|
Issue & PRINT permit SFD | | | 3/13/2020 | | DONE |
|
|
|
|
Application received | | | 3/8/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 8 2020 7:00PM
|