General Inspection | 5/11/2020 | 5/11/2020 | 5/12/2020 | P | PASS |
Michael Zawacki
|
|
|
Suez is on Pierce installing new water lines. Forms have been place, some rebar, no workers at site. No washout on site yet. Backfill is piled on lot.
|
Permit Ready to Issue | | | 5/1/2020 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 5/1/2020 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 4/3/2020 | | 4/3/2020 | | PASS |
Andy J. Long
|
|
|
No ESC plan required. This is flat lot within the designated hillside. ESC General Permit will be issued. Concrete washout containment, storm drain sediment protection, and regular housekeeping will be required.
|
Application received | | | 3/27/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 27 2020 9:04AM
|