Site Preparation | 6/1/2020 | 6/1/2020 | 6/1/2020 | P | PASS |
Andy J. Long
|
|
|
New addition within existing vegetated and stabilized area. RP will install sediment control wattle if placing stockpile next to property edge.
Posted ESC permit sign, will use concrete washout containment.
Request to not install sediment control on drain on Claremont due long stabilized driveway
|
Issue & PRINT permit SFD | | | 4/20/2020 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 4/17/2020 | | 4/17/2020 | | DONE |
Michael Zawacki
|
|
|
Site prep inspection required. RP needed.
|
VOIDED CHANGE STATUS | | | 4/17/2020 | | DONE |
|
|
|
PER JOSH NO ESC NEEDED
|
Change Status (ISS) | | | 4/17/2020 | | DONE |
|
|
|
WRONG PERMIT VOIDED. PLEAE STILL ISSUE THIS WHEN THEY PAY
|
Application received | | | 4/4/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 4 2020 5:52PM
|