General Inspection | 7/29/2020 | 7/29/2020 | 7/30/2020 | P | PART |
Michael Zawacki
|
|
|
Silt fence has been installed and road swept. Spill absorber placed on spill, is still in road. Crew on site bending rebar.
|
Site Preparation | 7/24/2020 | 7/24/2020 | 7/24/2020 | P | FAIL |
Andy J. Long
|
|
|
No site prep requested - RP changed to Jim Jewitt.
Correction requests to JIm: - install sediment control wattle or silt fence to provide barrier for runof flowing to 26th. - get spill clean up material for oil leak that occured. - sweep road in front of home
|
Site Preparation | 5/19/2020 | 5/22/2020 | 5/27/2020 | P | CANC |
Andy J. Long
|
|
|
No activity at site yet. RP-GC has beeen notified to set up site preparation inspection
|
Site Preparation | 5/18/2020 | 5/18/2020 | 5/19/2020 | P | PEND |
Andy J. Long
|
|
|
Called RP to check on status of project. Work has not started.
Excavation to start next week. RP Steve will call to notify for BMP inspection/Site Preparation
|
Permit Ready to Issue | | | 5/14/2020 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 5/14/2020 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 4/15/2020 | | 4/15/2020 | | DONE |
Michael Zawacki
|
|
|
Site prep required.
|
Application received | | | 4/6/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 6 2020 11:43AM
|