General Inspection | 8/10/2020 | 8/10/2020 | 8/10/2020 | P | PASS |
Andy J. Long
|
|
|
WIP. NO trackout or loose dirt around perimeter. Trash contained. Water line or utility cuty on back slope behind home, will need stabilization and/or perimeter sediment control
|
General Inspection | 7/22/2020 | 7/22/2020 | 7/22/2020 | P | PASS |
Michael Zawacki
|
|
|
WIP on framing, site is clean.
|
General Inspection | 6/1/2020 | 6/1/2020 | 6/1/2020 | P | PASS |
Michael Zawacki
|
|
|
Site clean. Pour is scheduled for today, site has lined washout.
|
General Inspection | 5/28/2020 | 5/28/2020 | 5/28/2020 | P | PASS |
Michael Zawacki
|
|
|
Building pad has been excavated. Crew has started setting forms, no workers at site. Site still needs washout.
|
General Inspection | 5/14/2020 | 5/14/2020 | 5/15/2020 | P | CANC |
Michael Zawacki
|
|
|
|
Site Preparation | 5/14/2020 | 5/14/2020 | 5/14/2020 | P | PASS |
Andy J. Long
|
|
|
WIP. Vegetative buffer preserved below site. Will need to keep sidewalk and gutter clean at all times.
No trackout or muddy runoff from site observed during rain
|
Issue & PRINT permit SFD | | | 5/7/2020 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 4/29/2020 | | 4/29/2020 | | DONE |
Andy J. Long
|
|
|
Site preparation inspection/notification is required. Install downslope perimeter wattles per plan. Use lined/leakproof concrete washout.
|
Application received | | | 4/21/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 21 2020 3:08PM
|