Site Preparation | 7/27/2020 | 7/27/2020 | 7/28/2020 | P | PASS |
Michael Zawacki
|
|
|
Perimeter controls installed, concrete washout on site. Rock entrance and trash box on site. Backfill is on lot above.
|
Issue & PRINT permit SFD | | | 7/22/2020 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 6/18/2020 | | 6/18/2020 | | DONE |
Michael Zawacki
|
|
|
Foothills home, site prep inspection required.
|
Application received | | | 6/2/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 2 2020 11:56AM
|