Site Preparation | 8/13/2020 | 8/13/2020 | 8/13/2020 | P | PASS |
Michael Zawacki
|
|
|
Lot is prepped for forms, no work begun on fgootings. New lined and contained washout. Old poorly built washout needs to be cleaned and removed.
|
Permit Ready to Issue | | | 8/7/2020 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 8/7/2020 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 7/6/2020 | | 7/6/2020 | | DONE |
Andy J. Long
|
|
|
ESC site plan and narrative submitted. ESC site preparation inspection is required before excavation and after BMP installation
|
Application received | | | 6/15/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 15 2020 3:00PM
|