DOC - Permit Finaled | 1/10/2002 | 1/10/2002 | 1/10/2002 | P | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 1/10/2002 2:36:40 PM
|
INSP-Final Inspection | 5/25/2000 | 5/25/2000 | 5/25/2000 | P | PASS |
Rick Jackson
|
|
|
|
INSP-Sprinkler Rough-in | 5/19/2000 | 5/19/2000 | 5/18/2000 | P | PASS |
Rick Jackson
|
|
|
tenant improvement drops installed per plans; awaiting alarms
|
INSP-Sprinkler Rough-in/Hydro | 5/19/2000 | 5/19/2000 | 5/18/2000 | P | PASS |
Rick Jackson
|
|
|
hyro for t/i work okay; awaiting alarms
|
Inspection Record Card- Bld | 2/10/2000 | 2/10/2000 | 2/10/2000 | | DONE |
|
|
|
|
Telephone call | | | 2/10/2000 | | DONE |
|
|
|
TALKED TO SHELLY TO VERIFY PLANS ARE READY
|
Issue permit | | | 2/10/2000 | | DONE |
|
|
|
|
Sprinkler Plan Check | 2/10/2000 | | 2/10/2000 | | PASS |
|
|
|
|
Sprinkler Plan Check | 1/31/2000 | | 2/9/2000 | | FAIL |
|
|
|
Need hydraulic graph and site plan.
|
Telephone call | | | 2/9/2000 | | FAIL |
|
|
|
Called and asked where the site plan was and provide the required calculation graph sheet. Indicated to me he faxed site plan yesterday. He will refax with my name attached.
|
Telephone call | | | 2/8/2000 | | FAIL |
|
|
|
Called Ray Lopez and requested site plan.
|
Application received | | | 1/31/1999 | | PASS |
|
|
|
|
Miscellaneous action | | | | | PEND |
|
|
|
PLANS TAKEN TO FRONT DESK FOR CALLING AND DISTRIBUTION
|
Case Summary | | | | | PASS |
|
|
|
|