INSP-Final Inspection | 5/2/2003 | 5/2/2003 | 5/2/2003 | P | PASS |
Troy Cobbley
|
|
|
Inspection passed by 406. I'm DOC finaling
|
DOC - Permit Finaled | 5/2/2003 | 5/2/2003 | 5/2/2003 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 5/2/2003 12:20:42 PM
|
INSP-Alarm Testing | 3/3/2000 | 3/3/2000 | 3/3/2000 | A | PASS |
Joe Tawney
|
|
|
Reinsp. ok on alarm system and test.
|
INSP-Alarm Testing | 3/1/2000 | 3/1/2000 | 3/1/2000 | A | FAIL |
Joe Tawney
|
|
|
Alarm test fail 2 AHV not running spklr flow switch not operating properly.
|
Miscellaneous action | | | 2/11/2000 | | PASS |
|
|
|
PLANS TAKEN TO FRONT DESK FOR CALLING AND DISTRIBUTION
|
Alarm Plan Check | 2/11/2000 | | 2/3/2000 | | PASS |
|
|
|
|
Application received | | | 1/31/2000 | | PASS |
|
|
|
REQUIRES A PHYSICAL ADDRESS FOR PARCAL # AND PERMITTING. PROPERTY IS IN THE LATEST ANNEX.
|
Case Summary | | | | | |
|
|
|
|