INSP-Final Inspection | 1/8/2002 | 1/8/2002 | 1/8/2002 | A | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 1/8/2002 10:59:48 AM finaled by 406
|
DOC - Permit Finaled | 1/8/2002 | 1/8/2002 | 1/8/2002 | A | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 1/8/2002 10:59:54 AM
|
INSP-Final Inspection | 10/31/2000 | 10/31/2000 | 10/31/2000 | P | PART |
Joe Tawney
|
|
|
Rick ###-#### pager OK on spklr system for project 11/1/2000 7:55:30 AM
|
INSP-Sprinkler Rough-in/Hydro | 10/9/2000 | 10/9/2000 | 10/9/2000 | P | PART |
Joe Tawney
|
|
|
rick pager ###-#### OK on hydro tesr for
clean room 10/10/2000 7:56:56 AM
|
INSP-Sprinkler Rough-in | 9/26/2000 | 9/26/2000 | 9/26/2000 | P | PART |
Joe Tawney
|
|
|
r/i rick --pager ###-#### OK on rough in of office area and corridors 9/27/2000 8:09:31 AM
|
INSP-Sprinkler Rough-in | 9/25/2000 | 9/25/2000 | 9/25/2000 | P | PART |
Joe Tawney
|
|
|
rick-- ###-#### value installation insp OK on installation of PIV valve 9/26/2000 7:28:00 AM
|
INSP-Sprinkler Rough-in | 9/21/2000 | 9/21/2000 | 9/21/2000 | P | PART |
Joe Tawney
|
|
|
r/i-- pager ###-#### -rick OK on rough in of cleanroom and subfloor 9/22/2000 7:59:43 AM
|
Issue permit | | | 9/7/2000 | | DONE |
|
|
|
|
Sprinkler Plan Check | 9/1/2000 | | 9/1/2000 | | PASS |
Bill Alexander
|
|
|
New P.I. Control for outside access.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/1/2000 | | PASS |
Bill Alexander
|
|
|
|
Telephone call | | | 9/1/2000 | | DONE |
|
|
|
called permit ready
|
Issue permit | | | 8/29/2000 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/25/2000 | | 8/28/2000 | | PASS |
Bill Alexander
|
|
|
SPRINKLERS ADDED, CHANGED AND MODIFIED (69).
|
Telephone call | | | 8/28/2000 | | DONE |
Bill Alexander
|
|
|
REVISION TO ORIGINAL NOTES FOR ADDED HEADS AND MODIFICATIONS.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/28/2000 | | PASS |
Bill Alexander
|
|
|
|
Telephone call | | | 8/28/2000 | | DONE |
|
|
|
Brad Bettencourt ###-####
|
INSP-Conference | 7/6/2000 | 7/7/2000 | 7/7/2000 | A | PART |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 07/06/2000 at 12:01:06. Contact: ###-####. Ok to cover hard lid in corridors ok to install ceiling in cleanroom. 7/7/00 1:39:47 PM
|
Issue permit | | | 5/11/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | 5/8/2000 | 5/8/2000 | 5/8/2000 | | DONE |
|
|
|
|
Telephone call | | | 5/8/2000 | | DONE |
|
|
|
left mess for brad that permit is ready
|
Sprinkler Plan Check | 5/8/2000 | | 5/8/2000 | | PASS |
Bill Alexander
|
|
|
|
Telephone call | | | 5/8/2000 | | PASS |
Bill Alexander
|
|
|
Faxed copy of review notes to the designer.
|
Miscellaneous action | | | 5/8/2000 | | PASS |
Bill Alexander
|
|
|
Plans taken to front desk for calling, fee collection and permitting.
|
Sprinkler Plan Check | 3/27/2000 | | 4/5/2000 | | FAIL |
Bill Alexander
|
|
|
Lack enough detail to verify UFC Article 51, and 1003.2.6 compliance. Plan on hold until verification is provided. BLD plan review is not completed at this date.
|
Telephone call | | | 4/5/2000 | | FAIL |
Bill Alexander
|
|
|
Call Brad Bettencourt indicated that plans are not detailed enough to verify UFC Article 51and 1003.2.6 compliance.
|
Application received | | | 3/27/2000 | | PASS |
Bill Alexander
|
|
|
|
Case Summary | | | | | |
Bill Alexander
|
|
|
|