INSP-Final Inspection | 11/16/2001 | 11/16/2001 | 11/16/2001 | A | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 11/16/2001 10:33:39 AM Fire sprinkler finaled. OK for perm occ
|
DOC - Permit Finaled | 11/16/2001 | 11/16/2001 | 11/16/2001 | A | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 11/16/2001 10:33:44 AM
|
INSP-Sprinkler Rough-in/Hydro | 8/7/2001 | 8/8/2001 | 8/8/2001 | A | PASS |
Joe Tawney
|
|
|
oK ON HYDRO TEST of FDC 8/8/2001 1:33:30 PM
|
INSP-Sprinkler Rough-in/Hydro | 8/7/2001 | 8/7/2001 | 8/7/2001 | P | PART |
Joe Tawney
|
|
|
OK on rough in of 3rd flr and Ok on above ground hydro test except FDC connection 8/7/2001 3:07:23 PM
|
INSP-Sprinkler Rough-in | 7/24/2001 | 7/25/2001 | 7/25/2001 | A | PART |
Joe Tawney
|
|
|
OK on rough in of 2nd floor with 3 corrections 7/25/2001 10:28:34 AM
|
INSP-Sprinkler Rough-in/Hydro | 7/2/2001 | 7/3/2001 | 7/3/2001 | A | PART |
Joe Tawney
|
|
|
OK on spklr rough in on 1st floor 7/3/2001 10:07:26 AM
|
Issue permit | | | 6/27/2001 | | DONE |
|
|
|
|
Telephone call | | | 6/20/2001 | | DONE |
|
|
|
called Viking Sprinklers ###-####
|
Inspection Record Card- Fire | 6/20/2001 | | 6/20/2001 | | DONE |
|
|
|
|
Sprinkler Plan Check | 6/7/2001 | | 6/20/2001 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/20/2001 | | DONE |
Bill Alexander
|
|
|
|
Sprinkler Plan Check | 5/25/2001 | | 6/1/2001 | | FAIL |
Bill Alexander
|
|
|
Third floor was not calculated correctly.
|
Telephone call | | | 6/1/2001 | | DONE |
|
|
|
Faxed copy of failed review to Viking.
|
Application received | | | 7/10/2000 | | PASS |
Bill Alexander
|
|
|
Pending project changes (information provided from sprinkler contractor).
|
Case Summary | | | | | DONE |
|
|
|
|
Case Summary | | | | | DONE |
|
|
|
|