INSP-Final Inspection | 8/14/2001 | 8/14/2001 | 8/14/2001 | P | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 8/14/2001 4:30:26 PM
|
DOC - Permit Finaled | 8/14/2001 | 8/14/2001 | 8/14/2001 | P | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 8/14/2001 4:31:44 PM
|
INSP-Final Inspection | 3/27/2001 | 3/30/2001 | 3/30/2001 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 03/27/2001 at 16:46:32. Contact: ###-####.
|
INSP-Supply line flush | 2/23/2001 | 2/23/2001 | 2/23/2001 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 02/23/2001 at 08:22:23. Contact: ###-####. hydro test okay on underground 2/23/2001 10:50:11 AM
|
INSP-Sprinkler Rough-in/Hydro | 2/21/2001 | 2/21/2001 | 2/21/2001 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 02/21/2001 at 09:32:15. Contact: ###-####. hydro test okay for overhead of both dry and wet systems; still need to hydro the underground 2/21/2001 5:27:17 PM
|
Issue permit | | | 2/20/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | 1/12/2001 | 1/12/2001 | 1/12/2001 | | DONE |
|
|
|
|
Sprinkler Plan Check | 1/11/2001 | | 1/11/2001 | | DONE |
Bill Alexander
|
|
|
Resubmittal - Complete Set - Attic Modifications.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/11/2001 | | DONE |
Bill Alexander
|
|
|
|
Plan assigned to (Bill) | 9/1/2000 | | 1/11/2001 | | DONE |
Bill Alexander
|
|
|
1/11/2001 15:40:03 JWA - activity updated through activity FIRA22 from case FIR00-00513.
|
Sprinkler Plan Check | 12/15/2000 | | 1/9/2001 | | FAIL |
Bill Alexander
|
|
|
Dry system piping does not meet NFPA 13. Other remote area requires calculations. Drain and Inspectors test is not to NFPA 13.
|
Telephone call | | | 1/9/2001 | | DONE |
|
|
|
Called Don Weland and went over plans and continuing problems in review. Required resubmittal of the Dry System.
|
INSP-Sprinkler Rough-in | 12/6/2000 | 12/6/2000 | 12/6/2000 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 12/6/2000 4:00:51 PM ///// heads overspaced in cathedral area; sprinklers required under stage; dry plans not on-site; insulation covering wet pipe 12/6/2000 4:03:13 PM
|
INSP-Supply line flush | 12/4/2000 | 12/5/2000 | 12/6/2000 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/04/2000 at 15:40:04. Contact: ###-####.////flush already complete 12/6/2000 4:01:36 PM
|
INSP-Supply line flush | 12/1/2000 | 12/4/2000 | 12/4/2000 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/01/2000 at 11:43:32. Contact: ###-####.////// underground flush okay 12/4/2000 3:10:25 PM
|
Sprinkler Plan Check | 11/22/2000 | | 12/2/2000 | | FAIL |
Bill Alexander
|
|
|
2nd submittal - Lack complete readable plans and previous followup plans. Provided (5/12 pitch), 12/15/2000. Revised attic plans completely!
|
Telephone call | | | 12/1/2000 | | DONE |
|
|
|
Faxed copy of failed review to Shilo Auto. Spr. Co.
|
Issue permit | | | 9/21/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | 9/19/2000 | 9/19/2000 | 9/19/2000 | | DONE |
|
|
|
|
Telephone call | | | 9/19/2000 | | DONE |
|
|
|
called permit ready
|
Sprinkler Plan Check | 9/1/2000 | | 9/19/2000 | | PASS |
Bill Alexander
|
|
|
PARTIAL APPROVAL TO PRECEED WITH RESUBMITTAL OF:
Plans are of a quality that will require resubmittal for clarity in archive scanning City of Boise records. provide completed plans that include all node points on the riser details. Provide in your section on the Attic Sprinkler Piping and head location (plan 5 of 5) minimum & maximum distances allowed from the Peak. Provide the pitch of the roof system on plan 5 of 5, to verify SD1 listed limitations.
Provide a note on the plans that the dry system piping shall be pitched to meet the minimum pitched per NFPA 13:4-14.3.3.
|
Sprinkler Plan Check | 9/1/2000 | | 9/19/2000 | | PASS |
Bill Alexander
|
|
|
PARTIAL * Passed on condition that new readable plans be submitted. Dry system failed due to complete information. Resubmittal required.
|
Application received | | | 9/1/2000 | | |
|
|
|
|
Case Summary | | | | | DONE |
|
|
|
|