Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR00-00554
StatusFinaled
Name SCP GLOBAL TECHNOLOGIES
Site Address 8455 W WESTPARK ST
Project NameSPR SCPGLOBAL 455/456
Customer Number 
ePlanReview 
Description
SCP GLOBAL TECHNOLOGIES (BLDG 455/456) PHASE II - To fire sprinkler a 4,992 sq.ft. loading dock to the northeast corner of building, fire sprinkler a 1,431 sq.ft. enclosed link between Bldg. 455 and 456 at the South end, to attach buildings, and miscellaneous site work per DRH00-00076. With this permit both buildings will be considered one building of Type V-N Construction with unlimited area, allowed by the 20 year renewable lease acquisition of the railroad right-of-way so there are four 60 foot yards around the perimeter and the building is fully fire sprinklered. All per approved plans, notes & attached plan review comments. NOTE: This building is fully sprinkled for allowable area increase.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection9/12/20019/12/20019/12/2001PPASS
DetailsJoe Tawney
Added by Inspector: 406 On 9/12/2001 3:35:19 PM
DOC - Permit Finaled9/12/20019/12/20019/12/2001PPASS
DetailsJoe Tawney
Finaled by inspector at 9/12/2001 3:35:24 PM
INSP-Final Inspection12/19/200012/19/200012/19/2000PPART
DetailsJoe Tawney
###-####. 12/19/2000 2:07:51 PM
INSP-Sprinkler Rough-in11/22/200011/22/200011/22/2000PCANC
DetailsJoe Tawney
DOUG-- ###-#### R/I--WILL NOT BE THERE CALL IF QUESTIONS
INSP-Sprinkler Rough-in/Hydro10/18/200010/18/200010/18/2000PPART
DetailsJoe Tawney
overhead Rick ###-#### pager OK on rough in and hydro test of loading dock. 10/19/2000 7:49:16 AM
Issue permit  10/5/2000 DONE
Inspection Record Card- Bld10/4/200010/4/200010/4/2000 DONE
Telephone call  10/4/2000 DONE
called permit ready
Telephone call  10/3/2000 DONE
DetailsBill Alexander
Copy of plan review faxed to Treasure Valley
Sprinkler Plan Check9/25/2000 10/3/2000 PASS
DetailsBill Alexander
Plan assigned to (Bill)9/25/2000 10/3/2000 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  10/3/2000 PASS
DetailsBill Alexander
Application received  9/22/2000 PASS
DetailsBill Alexander
Case Summary    DONE