INSP-Final Inspection | 8/30/2001 | 8/30/2001 | 8/30/2001 | A | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 8/30/2001 9:04:48 AM update of records; previously completed and passed
|
DOC - Permit Finaled | 8/30/2001 | 8/30/2001 | 8/30/2001 | A | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 8/30/2001 9:04:57 AM
|
INSP-Sprinkler Rough-in/Hydro | 10/12/2000 | 10/13/2000 | 10/12/2000 | A | PART |
Rick Jackson
|
|
|
Shelly ###-#### installed per plans in car rental area 10/12/2000 1:45:16 PM
|
Issue permit | | | 10/12/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | 10/11/2000 | 10/11/2000 | 10/11/2000 | | DONE |
|
|
|
|
Telephone call | | | 10/11/2000 | | DONE |
|
|
|
Ray Lopez ###-####
|
Plan assigned to (Bill) | 10/4/2000 | | 10/11/2000 | | DONE |
|
|
|
10/11/2000 08:51:14 JWA - activity updated through activity FIRA22 from case FIR00-00573.
|
Sprinkler Plan Check | 10/11/2000 | | 10/11/2000 | | PASS |
Bill Alexander
|
|
|
|
Telephone call | | | 10/11/2000 | | DONE |
|
|
|
Faxed copy of review to Shilo also indicating plans are ready and cost.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/11/2000 | | DONE |
Bill Alexander
|
|
|
|
Sprinkler Plan Check | 10/4/2000 | | 10/6/2000 | | FAIL |
Bill Alexander
|
|
|
|
Telephone call | | | 10/6/2000 | | DONE |
Bill Alexander
|
|
|
Called ray lopez and asked him about ceiling - soffit - ceiling - dimensioning - existing sprinkler head spacing. Everything known, but the existing spacing.
|
Telephone call | | | 10/6/2000 | | DONE |
Bill Alexander
|
|
|
Received a call from Troy (Sprinkler Forman). Qestioned the layout and I indicated it was not correct due to obstruction rules and head response time, etc.
|
Application received | | | 10/4/2000 | | |
|
|
|
|
Case Summary | | | | | DONE |
|
|
|
|