Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR00-00587
StatusFinaled
Name SIMPLEX
Site Address 2645 W AIRPORT WAY
Project NameALM - VISTA INN ADD'N
Customer Number 
ePlanReview 
Description
Vista Inn - To extend the existing fire alarm system into a new addition built under BLD00-02437. To include MFA's, in-duct smoke detectors for HVAC shutdown, area smoke detectors in the rated corridor, and at the door on the existing hotel side for door hold-open release. A new NAC panel will power the strobes in this area; horns and all initiating devices to be powered from the main FACP.
The Bldg permit is to add 6,092 sq. ft to the southeast corner of the existing motel; extend existing area separation wall across corridor and to the exterior wall. This will be an A3/200 occupancy/load. Note this portion of the building is sprinklered for 1-hour substitution and the motel area is sprinklered for area increase.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled2/13/20022/13/20022/13/2002APASS
DetailsRick Jackson
Finaled by inspector at 2/13/2002 9:00:57 AM
INSP-Final Inspection3/19/20013/19/20013/19/2001PPASS
DetailsRick Jackson
Added by Inspector: 409 On 3/19/2001 2:55:03 PM
INSP-Final Inspection3/12/20013/14/20013/14/2001AFAIL
DetailsRick Jackson
Kate ###-#### please call first c/n issued 3/14/2001 10:23:16 AM
Issue permit  1/8/2001 DONE
Inspection Record Card- Bld1/4/20011/4/20011/4/2001 DONE
Telephone call  1/4/2001 DONE
Alarm Plan Check12/8/2000 1/3/2001 PASS
Resubmittal - Revised plans dropped off By Troy Cobbley.
PLANS/APPL TAKEN TO FRONT DESK  1/3/2001 PASS
Miscellaneous action  11/29/2000 PEND
Plans returned to Troy Cobbley of Simplex for revising to reflect rated corridor.
Plan assigned to (SAM)10/16/2000 10/23/2000 PEND
Bldg plans denied by Building dept. Hold these plans until rated corridors have been established and identified on plans. Hold open devices shown are not where the anticipated corridor will be. Advised Troy Cobbley, Simplex.
Application received  10/16/2000  