INSP-Conference | 8/14/2001 | 8/14/2001 | 8/14/2001 | P | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 8/14/2001 4:12:44 PM
|
DOC - Permit Finaled | 8/14/2001 | 8/14/2001 | 8/14/2001 | P | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 8/14/2001 4:14:27 PM
|
INSP-Final Inspection | 1/9/2001 | 1/9/2001 | 1/9/2001 | A | PASS |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 1/9/2001 8:57:26 AM
|
INSP-Final Inspection | 1/9/2001 | 1/8/2001 | 1/8/2001 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 1/9/2001 9:00:09 AM dry air pressure not working; valve not supervised; check valve needs repair kit; standard response head in elevator machine room 1/9/2001 9:02:43 AM
|
INSP-Final Inspection | 12/29/2000 | 12/29/2000 | 1/2/2001 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/29/2000 at 09:08:04. Contact: ###-####. outside control valve; hydro dry and FDC; tampers on dry system 1/2/2001 10:06:20 AM
|
INSP-Supply line flush | 12/27/2000 | 12/28/2000 | 12/28/2000 | A | NR |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/27/2000 at 11:45:08. Contact: ###-####.
|
INSP-Supply line flush | 12/26/2000 | 12/27/2000 | 12/27/2000 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/26/2000 at 13:40:07. Contact: ###-####./// flush okay 12/27/2000 4:17:09 PM
|
INSP-Supply line flush | 12/15/2000 | 12/15/2000 | 12/15/2000 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/15/2000 at 09:35:03. Contact: ###-####.///// underground hydro only okay 12/15/2000 4:04:47 PM
|
INSP-Sprinkler Rough-in/Hydro | 12/8/2000 | 12/11/2000 | 12/11/2000 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/08/2000 at 09:31:17. Contact: ###-####./// hydro okay on attic system. need additional sway bracing; overspaced heads; painted heads; inspectors test not installed per plans and will relocate 12/12/2000 9:41:21 AM
|
Telephone call | | | 12/6/2000 | | DONE |
|
|
|
talked to dave to verify plans are ready
|
Issue permit | | | 12/6/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | 12/5/2000 | 12/5/2000 | 12/5/2000 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 11/15/2000 | | 12/5/2000 | | DONE |
|
|
|
12/5/2000 09:08:53 JWA - activity updated through activity FIRA22 from case FIR00-00630.
|
Sprinkler Plan Check | 12/4/2000 | | 12/5/2000 | | PASS |
Bill Alexander
|
|
|
|
Telephone call | | | 12/5/2000 | | DONE |
|
|
|
Faxed copy of review to Commerical.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/5/2000 | | DONE |
Bill Alexander
|
|
|
|
Sprinkler Plan Check | 11/27/2000 | | 12/4/2000 | | FAIL |
Bill Alexander
|
|
|
Calculation problem needs verified.
|
Telephone call | | | 12/4/2000 | | FAIL |
Bill Alexander
|
|
|
Phoned John Warnick 2:00pm on dry system calc elevations not jiving with structure, in which case it would appear the elevation plugged in to low for the attic head locations.
|
Telephone call | | | 11/16/2000 | | DONE |
Bill Alexander
|
|
|
Copy of failed review faxed to Commercial.
|
Sprinkler Plan Check | 11/3/2000 | | 11/16/2000 | | FAIL |
Bill Alexander
|
|
|
Need hanger locations, dimensioned elevation to verifiy calculation elevation pressure losses, clarification of room identifications of tenants, clarrification of construction (NFPA 13:1-4.6), sprinkler head data submittals, copy of the underground supply attached to these plans for calculation verification, (done under a seperated permit), pendants not shown in this permit, capacity of dry system......etc.
|
Application received | | | 11/3/2000 | | PASS |
Bill Alexander
|
|
|
|
Case Summary | | | | | DONE |
|
|
|
|