Case Summary | | | 8/17/2015 | | DONE |
|
|
|
|
INSP-Final Inspection | 6/4/2001 | 6/4/2001 | 6/4/2001 | P | FAIL |
Rick Jackson
|
|
|
###-#### aaron heads at window not per listing; alarms not complete 6/4/2001 3:32:23 PM
|
INSP-Final Inspection | 5/22/2001 | 5/22/2001 | 5/22/2001 | P | FAIL |
Rick Jackson
|
|
|
Aaron ###-#### not a final inspection - hydro test okay 5/22/2001 1:44:36 PM
|
INSP-Sprinkler Rough-in/Hydro | 5/22/2001 | 5/22/2001 | 5/22/2001 | P | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 5/22/2001 1:43:54 PM hydro on dry and wet system okay 5/22/2001 1:44:11 PM
|
INSP-Final Inspection | 5/17/2001 | 5/17/2001 | 5/17/2001 | P | FAIL |
Rick Jackson
|
|
|
partial ###-#### not a final; air test okay on dry system 5/17/2001 12:15:14 PM
|
INSP-Sprinkler Rough-in/Hydro | 3/15/2001 | 3/16/2001 | 3/16/2001 | A | PART |
Rick Jackson
|
|
|
###-#### hydro complete on overhead systems - pass 3/16/2001 9:30:48 AM
|
INSP-Sprinkler Rough-in/Hydro | 3/13/2001 | 3/14/2001 | 3/14/2001 | P | PART |
Rick Jackson
|
|
|
###-#### underground flush and hydro okay 3/14/2001 3:22:32 PM
|
INSP-Sprinkler Rough-in/Hydro | 3/13/2001 | 3/13/2001 | 3/13/2001 | P | NR |
Rick Jackson
|
|
|
###-#### contractor called and said he won't be ready until 3/14/01 3/13/2001 2:11:12 PM
|
INSP-Sprinkler Rough-in | 3/12/2001 | 3/12/2001 | 3/12/2001 | P | PART |
Rick Jackson
|
|
|
###-#### okayt to cover lobby area 3/12/2001 11:03:09 AM
|
INSP-Sprinkler Rough-in | 3/12/2001 | 3/12/2001 | 3/12/2001 | P | PART |
Rick Jackson
|
|
|
1ST FLOOR //###-#### ERIN okay to cover lobby area 3/12/2001 11:02:53 AM
|
INSP-Sprinkler Rough-in | 3/8/2001 | 3/9/2001 | 3/9/2001 | A | PART |
Rick Jackson
|
|
|
3RD FLOOR-- COVER INSP -TREASURE VALLEY FIRE ###-#### okay to cover third floor (update of records) 3/9/2001 8:57:13 AM
|
INSP-Sprinkler Rough-in/Hydro | 2/27/2001 | 2/28/2001 | 2/28/2001 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 02/27/2001 at 11:52:20. Contact: . okay to cover 3rd floor and stairs 2/28/2001 10:23:13 AM
|
INSP-Sprinkler Rough-in | 2/5/2001 | 2/7/2001 | 2/7/2001 | A | FAIL |
Rick Jackson
|
|
|
John ###-#### 2/7/2001 10:17:11 AM attempted to inspect r/i onsecond and first floor areas under this underground permit; plans not approved yet 2/7/2001 10:17:58 AM
|
INSP-Supply line flush | 12/19/2000 | 12/20/2000 | 12/20/2000 | A | PASS |
Rick Jackson
|
|
|
Jim ###-#### supply line complete - okay to cover 12/20/2000 8:08:36 AM
|
INSP-Supply line flush | 12/8/2000 | 12/11/2000 | 12/11/2000 | P | PART |
Rick Jackson
|
|
|
FIRE JEFF-- ###-#### SUPPLY LINE FLUSH///// not a flush - 6 inch main stubbed out for about 10 ft. They will complete at later date. 12/11/2000 4:14:47 PM
|
Telephone call | | | 12/7/2000 | | DONE |
|
|
|
LEFT MESS FOR GREG THAT PERMIT IS READY
|
Application received | | | 12/6/2000 | | PASS |
Bill Alexander
|
|
|
|
Inspection Record Card- Bld | 12/6/2000 | 12/6/2000 | 12/6/2000 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 12/6/2000 | | 12/6/2000 | | DONE |
|
|
|
12/6/2000 15:22:04 JWA - activity updated through activity FIRA22 from case FIR00-00663.
|
Sprinkler Plan Check | 12/6/2000 | | 12/6/2000 | | PASS |
Bill Alexander
|
|
|
|
Telephone call | | | 12/6/2000 | | DONE |
|
|
|
FAXED COPY OF REVIEW TO TREASURE VALLEY FIRE.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/6/2000 | | DONE |
Bill Alexander
|
|
|
|
Case Summary | | | | | DONE |
|
|
|
|
Issue permit | | | | | |
|
|
|
|