Description |
* SCP GLOBAL TECHNOLOGIES OFFICE ADDITION, DRH00-00076 AND DRH00-00136 * To install fire sprinklers in a 18,962 ft/2, two story, type V-N, office addition based on occupancy groups, fully sprinklered, 60 feet all around, unlimited area building. Construction of reinforced concrete footings, foundation, columns, floor slabs, & exterior elements; structural steel columns, beams & GLB; framed walls, shear walls, floor & roof systems; interior finishes, elevator, stairs, electrical, plumbing, mechanical, sprinkler & alarm systems; to create office's, conference rooms, locker room & breakroom; accessibility requirements; and Zoning / Public Works conditions. Sprinkler work shall be per approved plans, attached related notes, plan review comments attached to approved plans, UFC, adopted and related NFPA pamphlets, BCO and Fire Department requirements. NOTE: THIS BUILDING MUST BE FULLY SPRINKLED FOR ALLOWABLE AREA INCREASE. Building permit is: BLD00-02474. *JWA*
|