Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR01-00068
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 5350 N QUAIL SUMMIT WAY
Project NameSPR DEWITT HILLSIDE HME
Customer Number 
ePlanReviewNo
Description
*DEWITT (DESTINY) HOME* This facility is a 3,345 ft/2 two story single family dwelling with a 892 ft/2 attached three car garage, a 98 ft/2 covered 2nd level balcony deck and covered concrete patios at rear of structure. This residence requires fire sprinkler protection throughout meeting NFPA 13D, modified to include fire sprinkler protection installed in the garage along the wall/ceilings common the living space. All fire sprinkler work per approved plans and attached review notes, UFC, NFPA 13D (modified) as regulated by the Fire Department. (1st floor 2,414 ft/2, 2nd floor 931 ft/2). This lot is within a hillside area and is subject to the hillside ordinances. Sprinkler flow alarm shall be attached to the residence smoke detection system. See condition list and attached memo. BLD00-03541
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection9/4/20019/4/20019/4/2001APASS
DetailsRick Jackson
Added by Inspector: 409 On 9/4/2001 9:13:59 AM
DOC - Permit Finaled9/4/20019/4/20019/4/2001APASS
DetailsRick Jackson
Finaled by inspector at 9/4/2001 9:14:05 AM
INSP-Final Inspection8/29/20018/30/20018/30/2001AFAIL
DetailsJoe Tawney
Final Fail Audible alarm cannot be heard thru out lving area 8/30/2001 5:04:15 PM
(F) Reprint permit  8/29/2001 DONE
INSP-Sprinkler Rough-in/Hydro6/4/20016/4/20016/4/2001PPART
DetailsJoe Tawney
OK on hydro test and spklr rough in 6/4/2001 3:25:10 PM
INSP-Sprinkler Rough-in/Hydro3/19/20013/21/20013/21/2001APART
DetailsJoe Tawney
###-#### Install 2 heads verify concealed spaces OK to cover 3/22/2001 8:20:01 AM
Issue permit  2/23/2001 DONE
Inspection Record Card- Bld2/22/20012/22/20012/22/2001 DONE
Telephone call  2/22/2001 DONE
bob knight ###-####
Plan assigned to (Bill)2/20/2001 2/22/2001 DONE
2/22/2001 11:50:55 JWA - activity updated through activity FIRA22 from case FIR01-00068.
Sprinkler Plan Check2/20/2001 2/22/2001 DONE
DetailsBill Alexander
Telephone call  2/22/2001 DONE
Faxed copy of review and notification of review completion to Debest.
PLANS/APPL TAKEN TO FRONT DESK  2/22/2001 DONE
DetailsBill Alexander
Application received  2/20/2001 PASS
DetailsBill Alexander
Case Summary    DONE