Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR01-00102
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 923 N MAPLE GROVE RD
Project NameSPR LINGER LONGER BLD 4
Customer Number 
ePlanReview 
Description
BUILDING # 4 - TYPE A * TO FIRE SPRINKLER A NEW 22,292 FT/2, THREE STORY, WOOD FRAMED, 18 UNIT APARTMENT BUILDING. THE FIRST FLOOR IS 8,328 FT/2 AND CONTAINS 6 GARAGES, TWO, TWO BEDROOM UNITS AND FOUR, ONE BEDROOM UNITS, THE SECOND FLOOR IS 8,514 FT/2 AND CONTAINS FOUR, TWO BEDROOM UNITS AND FOUR, ONE BEDROOM UNITS. THE THIRD FLOOR IS 5,550 FT/2 AND CONTAINS FOUR, TWO BEDROOM UNITS. ALL FIRE SPRINKLER WORK PER THE APPROVED PLANS, UFC, BCO AND RELATED, ADOPTED NFPA PAMPHLETS, AS REGULATED BY THE FIRE DEPARTMENT. NOTE: THIS BUILDING HAS A NFPA 13-R FIRE SPRINKLER SYSTEM. BUILDING PERMIT IS: BLD00-02809. *JWA*
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled12/17/200112/17/200112/17/2001PPASS
DetailsTroy Cobbley
Finaled by inspector at 12/17/2001 3:59:22 PM
INSP-Final Inspection8/8/20018/9/20018/9/2001APART
DetailsJoe Tawney
OK on relocation of FDC and OK on FDC hydro test 8/9/2001 2:26:55 PM
Issue permit  8/8/2001 DONE
Inspection Record Card- Fire8/7/2001 8/7/2001 DONE
Telephone call  8/7/2001 DONE
talked to Melody gave dollar amount
Sprinkler Plan Check8/6/2001 8/6/2001 PASS
DetailsBill Alexander
Relocated FDC, with Contractor and Joe Tawney (Inspector) as to verify an acceptable location reroute.
PLANS/APPL TAKEN TO FRONT DESK  8/6/2001 DONE
DetailsBill Alexander
INSP-Sprinkler Rough-in/Hydro8/1/20018/2/20018/2/2001PFAIL
DetailsJoe Tawney
Reinsp Fail Work not completed 8/2/2001 1:54:15 PM
INSP-Sprinkler Rough-in/Hydro7/13/20017/16/20017/16/2001PPART
DetailsJoe Tawney
OK on above ground hydro test 7/16/2001 3:12:34 PM
INSP-Sprinkler Rough-in/Hydro7/12/20017/13/20017/13/2001PCANC
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 07/12/2001 at 14:00:47. Contact: ###-####.
INSP-Supply line flush7/2/20017/3/20017/3/2001APART
DetailsJoe Tawney
OK on supply line flush 7/3/2001 10:53:19 AM
INSP-Sprinkler Rough-in/Hydro5/8/20015/9/20015/9/2001APART
DetailsJoe Tawney
###-#### building 4 OK to cover entire bldg 5/9/2001 11:54:20 AM
INSP-Sprinkler Rough-in4/27/20014/30/20014/30/2001PPART
DetailsJoe Tawney
###-#### OK on rough of East half of bldg 4/30/2001 4:34:25 PM
Issue permit  4/23/2001 DONE
Plan assigned to (Bill)3/7/2001 3/13/2001 DONE
3/13/2001 16:48:48 JWA - activity updated through activity FIRA22 from case FIR01-00102.
Sprinkler Plan Check3/8/2001 3/13/2001 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  3/13/2001 DONE
DetailsBill Alexander
Application received  3/7/2001 PASS
DetailsBill Alexander
Case Summary    DONE