DOC - Permit Finaled | 12/14/2001 | 12/14/2001 | 12/14/2001 | P | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 12/14/2001 12:14:02 PM
|
INSP-Sprinkler Rough-in/Hydro | 7/24/2001 | 7/25/2001 | 7/25/2001 | A | PART |
Joe Tawney
|
|
|
OK spklr rough in and hydro test . 7/24/2001 4:38:21 PM
|
INSP-Sprinkler Rough-in/Hydro | 6/7/2001 | 6/7/2001 | 6/7/2001 | P | PART |
Joe Tawney
|
|
|
Spklr rough in Add 2 heads and recalc 3 lines or heads off wall above stairs 6/7/2001 2:07:29 PM
|
INSP-Supply line flush | 5/17/2001 | 5/18/2001 | 5/18/2001 | A | PART |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 05/17/2001 at 11:45:55. Contact: ###-####. OK on supply line flush 5/18/2001 12:56:30 PM
|
Issue and Print Permit | | | 4/13/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | 3/16/2001 | | 3/16/2001 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 3/14/2001 | | 3/15/2001 | | DONE |
|
|
|
3/15/2001 15:03:33 JWA - activity updated through activity FIRA22 from case FIR01-00122.
|
Sprinkler Plan Check | 3/14/2001 | | 3/15/2001 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/15/2001 | | DONE |
Bill Alexander
|
|
|
|
Application received | | | 3/14/2001 | | PASS |
Bill Alexander
|
|
|
|
Case Summary | | | | | DONE |
|
|
|
|