Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR01-00124
StatusFinaled
Name C&S FIRE PROTECTION INC
Site Address 1650 N HILTON ST
Project NameSPR PRECON TECHNOLOGIES
Customer Number 
ePlanReview 
Description
PRECON TECHNOLOGIES * TO FIRE SPRINKLER A NEW 2,480 FT/2 ONE STORY OFFICE BUILDING WITH A 2,480 FT/2 BASEMENT. System is composed of an Ordinary Group 1Hazard design (.15/1500). Underground supply included in this permit with 6" Vinly-Lock 900, with Ductile Iron penetrating the Basement wall. Constructed of TJM Trus joist at floor and ceiling framing. All fire sprinkler work shall be per the approved plans and attached review notes, UFC, BCO installed per NFPA 13-1999, as regulated by the Fire Department. Building permit attached to this permit is: BLD98-02583. *JWA*
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/6/20041/6/20041/6/2004PPASS
DetailsTroy Cobbley
Scheduled by a contractor via Hello! on 1/6/2004 at 6:14:28 AM. Contact: ###-####.
DOC - Permit Finaled1/6/20041/6/20041/6/2004PPASS
DetailsTroy Cobbley
Finaled by inspector at 1/6/2004 4:24:24 PM
INSP-Final Inspection12/23/200312/23/200312/23/2003PFAIL
DetailsTroy Cobbley
The Ames backflow preventor is having a surging problem which won't allow the flow switch to activate. Owner needs to provide verification that the building will be provided with minimum heating for the wet sprinkler system 12/23/2003 4:28:17 PM
INSP-Supply line flush12/17/200312/17/200312/17/2003PPASS
DetailsTroy Cobbley
Underground hydro test is ok 12/18/2003 8:36:37 AM
INSP-Sprinkler Rough-in11/25/200311/26/200311/26/2003AFAIL
DetailsTroy Cobbley
dave ###-#### Final inspection needs to be done which is to include signs on riser, head box with heads and wrench, knox box, inspection tag for riser, site glass, test bell, lock control valves in open position and anything else the review notes may have. The original installing contractor that started the project is now out of business 11/26/2003 3:17:21 PM
INSP-Conference10/21/200310/21/200310/21/2003PDONE
DetailsTroy Cobbley
secure insulation in the southeast corner of the attic area, remove sheet rock in roof access stairway or provide one additional upright sprinkler in combustible space, provide sprinkler upright at the top of the elevator shaft, mount signs, provide head box, lock control valves in the open position, provide knox key box, provide tag per review note 36, test alarm bell and flow system
INSP-Supply line flush11/20/200211/21/200211/21/2002APASS
DetailsTroy Cobbley
supply line flush is ok. The main city line appears to be full of rust. 11/21/2002 10:25:22 AM
INSP-Final Inspection11/20/200211/21/200211/21/2002PNR
DetailsTroy Cobbley
Scheduled by a contractor via Hello! on 11/20/2002 at 11:55:17. Contact: ###-####.
INSP-Sprinkler Rough-in/Hydro6/18/20026/19/20026/19/2002APART
DetailsTroy Cobbley
OK to cover on the upper floor. other items on the correction list need to be completed 6/19/2002 9:55:33 AM
INSP-Sprinkler Rough-in/Hydro6/13/20026/13/20026/13/2002PPART
DetailsTroy Cobbley
above ground hydro test OK. Some items on the correction list completed 6/13/2002 3:52:15 PM
INSP-Sprinkler Rough-in/Hydro6/12/20026/12/20026/12/2002PCANC
DetailsTroy Cobbley
Scheduled by a contractor via Hello! on 06/12/2002 at 10:31:23. Contact: ###-####.
INSP-Sprinkler Rough-in5/23/20025/24/20025/24/2002AFAIL
DetailsTroy Cobbley
Hydro test failed, provide additional hanger on 3" main in south west corner of basement, provide sprinkler head in elevator shaft (per plan), provide retaining straps on all top beam clamps in basement, additional sprinkler heads may be required in spaces and the top and bottom of the east stairs, secure insulation to deck, provide earthquake bracing were all thread rod exceeds 6" in length, resubmitt plans that show the feed main changes to the second floor system 5/24/2002 10:47:56 AM
INSP-Sprinkler Rough-in/Hydro5/21/20025/22/20025/22/2002AFAIL
DetailsTroy Cobbley
Piping would not hold water-hydro failed 5/22/2002 3:29:57 PM
INSP-Supply line flush3/23/20013/26/20013/26/2001AFAIL
DetailsJoe Tawney
Supply line cover Fail Add washers at outside wall 3/26/2001 1:08:52 PM
INSP-Supply line flush3/26/20013/26/20013/26/2001PPART
DetailsJoe Tawney
ok TO COVER SUPPLY LINE 3/27/2001 8:21:53 AM
INSP-Supply line flush3/26/20013/26/20013/26/2001PPART
DetailsJoe Tawney
ok TO COVER SUPPLY LINE 3/27/2001 8:21:53 AM
Issue and Print Permit  3/23/2001 DONE
Inspection Record Card- Fire3/22/2001 3/22/2001 DONE
Telephone call  3/22/2001 DONE
called clarence gave dollar amount
Plan assigned to (Bill)3/15/2001 3/19/2001 DONE
3/19/2001 10:41:06 JWA - activity updated through activity FIRA22 from case FIR01-00124.
Sprinkler Plan Check3/15/2001 3/19/2001 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  3/19/2001 DONE
DetailsBill Alexander
Application received  3/15/2001 PASS
DetailsBill Alexander