Permit Information
Permit NumberFIR01-00143
StatusFinaled
Name VIKING AUTOMATIC SPRINKLER CO
Site Address 8000 FEDERAL WAY
Project NameSPR MIC 24E-TENANT
Customer Number 
ePlanReview 
Description
MICRON BUILDING 24E TENANT IMPROVEMENT FOR LAB (B24E) * TO INSTALL COMPLETE FIRE SPRINKLER (OVERHEAD) SYSTEMS, TO FINISH MICRON FABRICATION BUILDING LABORATORY BUILDING 24E FOR OCCUPANCY (EXCEPT THE RISERS). THIS PERMIT WILL INCLUDE THE INSTALLATION OF ALL NECESSARY MATERIAL AND EQUIPMENT TO COMPLETE THIS BUILDING FOR FULL OPERATION (EXCEPT THE RELATED RISERS). BUILDING #24E CONSISTS OF A 19,200 FT/2 BASEMENT LEVEL CONTAINING RESTROOMS, OFFICE AND LAB AREAS; AND A 24,100 FT/2 FIRST FLOOR CONTAINING OFFICE, LAB AND CHEMICAL STORAGE AREAS. THIS BUILDING REQUIRES FULL FIRE SPRINKLER PROTECTION. THE SPRINKLERS ARE USED FOR AREA INCREASE (UBC). ALL FIRE SPRINKLER DESIGN, INSTALLATION AND RELATED WORK SHALL BE PER THE APPROVED PLANS, ATTACHED COMMENT LIST, NFPA13, 72 (AND OTHER RELATED AND ADOPTED PAMPHLETS), AS REGULATED BY THE FIRE DEPARTMENT. THIS PERMIT IS ATTACHED TO: BLD01-00143. THE SHELL BUILDING WAS CONSTRUCTED UNDER PERMIT BLD00-01988. *JWA*
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/20/20022/20/20022/20/2002PPASS
DetailsRick Jackson
Added by Inspector: 409 On 2/20/2002 4:17:31 PM
DOC - Permit Finaled2/20/20022/20/20022/20/2002PPASS
DetailsRick Jackson
Finaled by inspector at 2/20/2002 4:18:03 PM
INSP-Final Inspection12/18/200112/19/200112/19/2001ACANC
DetailsRick Jackson
###-#### hydro test not a final inspection 12/19/2001 12:31:59 PM
INSP-Sprinkler Rough-in/Hydro12/19/200112/19/200112/19/2001PPART
DetailsRick Jackson
Added by Inspector: 409 On 12/19/2001 12:31:37 PM hydro okay for all 24E systems
INSP-Sprinkler Rough-in9/19/20019/24/20019/24/2001APART
DetailsRick Jackson
###-#### ROY hydro okay on areas 6 ground level and 5-6 interstitial 9/24/2001 9:08:50 AM
INSP-Sprinkler Rough-in8/29/20018/30/20018/30/2001APART
DetailsRick Jackson
r/i ###-####- roy hydro test okay partial; ned heads in gas room under duct work; requires additional earthquaking 8/30/2001 11:17:46 AM
INSP-Sprinkler Rough-in/Hydro8/27/20018/29/20018/29/2001ANR
DetailsRick Jackson
Scheduled by a contractor via Hello! on 08/27/2001 at 13:51:11. Contact: ###-####. will reschedule 8/29/2001 1:08:04 PM
INSP-Sprinkler Rough-in/Hydro8/14/20018/15/20018/15/2001APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 08/14/2001 at 09:03:24. Contact: ###-####. hydro okay on sub fab areas 5-6 only. need heads installed; earthquaking; straps on hangers 8/15/2001 2:30:11 PM
FIR-Aging Inspection8/9/20018/9/20018/9/2001 NR
DetailsRick Jackson
work in progress 8/9/2001 3:26:20 PM
Sprinkler Plan Check6/4/2001 6/4/2001 PASS
DetailsBill Alexander
Modifications made on minor issues for clarity and record.
Issue and Print Permit  5/10/2001 DONE
Inspection Record Card- Fire5/8/2001 5/8/2001 DONE
Sprinkler Plan Check5/7/2001 5/7/2001 PASS
DetailsBill Alexander
WITH CONDITION OF SPECIFIC RESUBMITTAL REQUIREMENTS. (REFER TO PLANS)
PLANS/APPL TAKEN TO FRONT DESK  5/7/2001 DONE
DetailsBill Alexander
Plan assigned to (Bill)3/26/2001 5/7/2001 DONE
5/7/2001 14:42:46 JWA - activity updated through activity FIRA22 from case FIR01-00143.
Telephone call  5/1/2001 DONE
Rick Reynalds called (Viking) in regards to requirements, of which was filled in per email Paul Marcolina forwarded to Rick.
Sprinkler Plan Check3/27/2001 4/26/2001 FAIL
DetailsBill Alexander
Lack pertinent information (reference mail to Marcolina 4/26/01 for list).
Miscellaneous action  4/26/2001 DONE
Emailed Paul Marolina on minimum requirements.
Application received  3/26/2001 FAIL
DetailsBill Alexander
Wrong attachment. Had it under BLD00-01988 (Shell Permits). This is a total and finish for 24E and should be under BLD00-02920.
Case Summary    DONE
Sprinkler Plan Check5/4/2001   PEND
DetailsBill Alexander