Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberFIR01-00172
StatusFinaled
Name TREASURE VALLEY FIRE
Site Address 1160 E EXCHANGE ST
Project NameSPR MICRON WAREHOUSE
Customer Number 
ePlanReview 
Description
Micron (PCS3302) Exchange Street Warehouse. To modify existing warehouse building fire sprinkler systems to accommodate equipment assembly area, high-piled storage and additional office area. To install new fire sprinkler protection in a new 2,952 ft/2 mezzanine for office use within the existing building and to add new "drops" in a new 3,060 ft/2, one story loading dock addition. Add new sprinklers protection in this facility shall be verified for present code requirements, meeting the requirements of the UFC and related Boise City Ordinances. System piping and appurtenance installation shall conform to NFPA 13-1999, approved plans, attachments, as regulated by the Fire Department. This building requires full fire sprinkler protection for area. Note: At time of review hazardous materials proposed for use and storage did not exceed the maximum allowable in UBC Tables 3-D and 3-E. *JWA*
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/27/20016/29/20016/29/2001APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 06/27/2001 at 10:55:54. Contact: ###-####.
DOC - Permit Finaled6/29/20016/29/20016/29/2001APASS
DetailsRick Jackson
Finaled by inspector at 6/29/2001 10:35:00 AM
INSP-Sprinkler Rough-in/Hydro6/6/20016/6/20016/6/2001PPASS
DetailsRick Jackson
Don ###-#### pager hydro okay; alarms/tampers not complete; need calc stickers, blue tag, aux drain sign 6/6/2001 3:52:20 PM
Issue and Print Permit  5/30/2001 DONE
Sprinkler Plan Check5/22/2001 5/29/2001 PASS
DetailsBill Alexander
Revised Remote area calculations with rack sprinkler modifications.
PLANS/APPL TAKEN TO FRONT DESK  5/29/2001 DONE
DetailsBill Alexander
3rd review / changes in remote area #3 commodity and racking change.
Inspection Record Card- Fire5/29/2001 5/29/2001 DONE
Telephone call  5/29/2001 DONE
called permit ready
INSP-Sprinkler Rough-in5/24/20015/24/20015/24/2001PPART
DetailsRick Jackson
###-#### pager okay to cover the lunch room. upper mezzanine and assembly room only 5/25/2001 5:58:53 AM
Issue permit  5/4/2001 DONE
Plan assigned to (Bill)4/9/2001 5/3/2001 DONE
5/1/2001 20:50:08 SLR - activity updated through activity FIRA22 from case FIR01-00269.
Sprinkler Plan Check5/1/2001 5/3/2001 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  5/3/2001 DONE
DetailsBill Alexander
Inspection Record Card- Fire5/3/2001 5/3/2001 DONE
Telephone call  5/3/2001 DONE
left mess that permit is ready
Sprinkler Plan Check4/30/2001 5/1/2001 FAIL
DetailsBill Alexander
Head missing in Test area #5. System design does not match NFPA 13: (Lack more detail to intent of design for some some areas1. Commodities, design hazard, system design intent.
Telephone call  5/1/2001 DONE
Faxed failed review 5:10pm
Sprinkler Plan Check4/10/2001 4/26/2001 FAIL
DetailsBill Alexander
Lack sufficient sprinkler data design information for rack storage areas.
Telephone call  4/26/2001 DONE
DetailsBill Alexander
Called Jeff Anderson/TV Fire and asked for more design information on rack storage design.
Application received  4/9/2001  
Case Summary    DONE
Case Summary    DONE
Case Summary    DONE