INSP-Final Inspection | 11/26/2001 | 11/26/2001 | 11/26/2001 | A | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 11/26/2001 11:25:30 AM Underground finaled.
|
DOC - Permit Finaled | 11/26/2001 | 11/26/2001 | 11/26/2001 | A | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 11/26/2001 11:25:38 AM
|
INSP-Supply line flush | 8/22/2001 | 8/23/2001 | 8/23/2001 | A | PART |
Joe Tawney
|
|
|
OK on supply line flush 8/23/2001 11:47:25 AM
|
INSP-Sprinkler Rough-in/Hydro | 6/18/2001 | 6/19/2001 | 6/19/2001 | P | CANC |
Joe Tawney
|
|
|
Cancel wrong permit number 6/19/2001 4:28:55 PM
|
INSP-Sprinkler Rough-in/Hydro | 6/11/2001 | 6/12/2001 | 6/12/2001 | P | CANC |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 06/11/2001 at 10:54:49. Contact: ###-####.--cancel per terry
|
INSP-Sprinkler Rough-in/Hydro | 6/11/2001 | 6/12/2001 | 6/12/2001 | P | CANC |
Joe Tawney
|
|
|
Cancel wrong job 6/12/2001 2:42:13 PM
|
INSP-Supply line flush | 5/11/2001 | 5/11/2001 | 5/11/2001 | P | PART |
Joe Tawney
|
|
|
OK to cover under slab and OK to cover supply line 5/11/2001 1:26:00 PM
|
Telephone call | | | 4/13/2001 | | DONE |
|
|
|
left mess that permit is ready
|
Issue permit | | | 4/13/2001 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 4/9/2001 | | 4/12/2001 | | DONE |
|
|
|
4/12/2001 09:09:15 SLR - activity updated through activity FIRA22 from case FIR01-00175.
|
Sprinkler Plan Check | | | 4/12/2001 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/12/2001 | | PASS |
|
|
|
|
Inspection Record Card- Fire | 4/12/2001 | | 4/12/2001 | | DONE |
|
|
|
|
Application received | | | 4/9/2001 | | |
|
|
|
|