INSP-Final Inspection | 11/26/2001 | 11/26/2001 | 11/26/2001 | A | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 11/26/2001 11:26:16 AM Underground finaled
|
DOC - Permit Finaled | 11/26/2001 | 11/26/2001 | 11/26/2001 | A | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 11/26/2001 11:26:25 AM
|
INSP-Supply line flush | 8/22/2001 | 8/23/2001 | 8/23/2001 | A | PART |
Joe Tawney
|
|
|
OK on supply line flush 8/23/2001 11:48:12 AM
|
INSP-Supply line flush | 5/10/2001 | 5/11/2001 | 5/11/2001 | P | PART |
Joe Tawney
|
|
|
OK to cover supply line 5/11/2001 1:30:45 PM
|
INSP-Supply line flush | 5/1/2001 | 5/3/2001 | 5/3/2001 | P | PART |
Joe Tawney
|
|
|
5/3/2001 3:02:32 PM OK to cover riser stub in to bldg 5/3/2001 3:02:56 PM
|
INSP-Supply line flush | 5/1/2001 | 5/2/2001 | 5/2/2001 | P | PART |
Joe Tawney
|
|
|
5/2/2001 2:17:30 PM OK to cover main under slab 5/2/2001 2:17:50 PM
|
INSP-Supply line flush | 4/18/2001 | 4/18/2001 | 4/18/2001 | P | CANC |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 04/18/2001 at 08:23:47. Contact: ###-####.shelly canc
|
Telephone call | | | 4/13/2001 | | DONE |
|
|
|
left mess that permit is ready
|
Issue permit | | | 4/13/2001 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 4/9/2001 | | 4/12/2001 | | DONE |
|
|
|
4/12/2001 09:27:17 SLR - activity updated through activity FIRA22 from case FIR01-00180.
|
Sprinkler Plan Check | | | 4/12/2001 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/12/2001 | | PASS |
|
|
|
|
Inspection Record Card- Fire | 4/12/2001 | | 4/12/2001 | | DONE |
|
|
|
|
Application received | | | 4/9/2001 | | |
|
|
|
|