DOC - Permit Finaled | 12/17/2001 | 12/17/2001 | 12/17/2001 | A | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 12/17/2001 11:58:01 AM Underground sprinkler finaled
|
INSP-Supply line flush | 9/5/2001 | 9/6/2001 | 9/6/2001 | A | PART |
Joe Tawney
|
|
|
OK on supply line flush 9/6/2001 11:53:53 AM
|
INSP-Supply line flush | 5/10/2001 | 5/11/2001 | 5/11/2001 | P | PART |
Joe Tawney
|
|
|
OK to cover supply line 5/11/2001 1:45:15 PM
|
INSP-Supply line flush | 5/8/2001 | 5/9/2001 | 5/9/2001 | A | PART |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 05/08/2001 at 10:00:23. Contact: ###-####. OK to cover under slab main and riser stub in to bldg 5/9/2001 11:01:22 AM
|
INSP-Supply line flush | 5/1/2001 | 5/2/2001 | 5/2/2001 | P | CANC |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 05/01/2001 at 16:47:08. Contact: ###-####. Cancel 5/2/2001 2:57:38 PM
|
Telephone call | | | 4/13/2001 | | DONE |
|
|
|
left mess that permit is ready
|
Issue permit | | | 4/13/2001 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 4/9/2001 | | 4/12/2001 | | DONE |
|
|
|
4/12/2001 09:37:22 SLR - activity updated through activity FIRA22 from case FIR01-00192.
|
Sprinkler Plan Check | | | 4/12/2001 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/12/2001 | | PASS |
|
|
|
|
Inspection Record Card- Fire | 4/12/2001 | | 4/12/2001 | | DONE |
|
|
|
|
Application received | | | 4/9/2001 | | |
|
|
|
|