INSP-Final Inspection | 1/28/2002 | 1/28/2002 | 1/28/2002 | A | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 1/28/2002 10:12:28 AM Underground system finaled
|
DOC - Permit Finaled | 1/28/2002 | 1/28/2002 | 1/28/2002 | A | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 1/28/2002 10:12:35 AM
|
INSP-Supply line flush | 9/5/2001 | 9/6/2001 | 9/6/2001 | A | PART |
Joe Tawney
|
|
|
OK on supply line flush 9/6/2001 11:54:34 AM
|
INSP-Supply line flush | 5/21/2001 | 5/22/2001 | 5/22/2001 | A | PART |
Joe Tawney
|
|
|
Ok to cover supply line 5/22/2001 10:54:00 AM
|
INSP-Supply line flush | 5/16/2001 | 5/17/2001 | 5/17/2001 | P | PART |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 05/16/2001 at 15:01:28. Contact: ###-####. OK to cover under slab main 5/17/2001 1:44:36 PM
|
Telephone call | | | 4/13/2001 | | DONE |
|
|
|
left mess that permit is ready
|
Issue permit | | | 4/13/2001 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 4/9/2001 | | 4/12/2001 | | DONE |
|
|
|
4/12/2001 09:42:16 SLR - activity updated through activity FIRA22 from case FIR01-00196.
|
Sprinkler Plan Check | | | 4/12/2001 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/12/2001 | | PASS |
|
|
|
|
Inspection Record Card- Fire | 4/12/2001 | | 4/12/2001 | | DONE |
|
|
|
|
Application received | | | 4/9/2001 | | |
|
|
|
|