DOC - Permit Finaled | 2/8/2002 | 2/8/2002 | 2/8/2002 | P | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 2/8/2002 2:07:34 PM Underground hydro OK. Underground finaled
|
INSP-Supply line flush | 9/5/2001 | 9/6/2001 | 9/6/2001 | A | PART |
Joe Tawney
|
|
|
OK on supply line flush 9/6/2001 11:54:55 AM
|
INSP-Supply line flush | 5/31/2001 | 5/31/2001 | 5/31/2001 | P | CANC |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 05/31/2001 at 10:05:47. Contact: ###-####.
|
INSP-Supply line flush | 5/21/2001 | 5/22/2001 | 5/22/2001 | A | PART |
Joe Tawney
|
|
|
OK to cover under slab main and OK to cover supply line 5/22/2001 10:54:42 AM
|
Telephone call | | | 4/13/2001 | | DONE |
|
|
|
|
Issue permit | | | 4/13/2001 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 4/9/2001 | | 4/12/2001 | | DONE |
|
|
|
4/12/2001 09:44:02 SLR - activity updated through activity FIRA22 from case FIR01-00197.
|
Sprinkler Plan Check | | | 4/12/2001 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/12/2001 | | PASS |
|
|
|
|
Inspection Record Card- Fire | 4/12/2001 | | 4/12/2001 | | DONE |
|
|
|
|
Application received | | | 4/9/2001 | | |
|
|
|
|