INSP-Final Inspection | 3/11/2002 | 3/11/2002 | 3/11/2002 | A | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 3/11/2002 7:59:37 AM Fire sprinkler system finaled
|
DOC - Permit Finaled | 3/11/2002 | 3/11/2002 | 3/11/2002 | A | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 3/11/2002 7:59:43 AM
|
INSP-Supply line flush | 6/4/2001 | 6/5/2001 | 6/5/2001 | A | PART |
Joe Tawney
|
|
|
Ok to cover spklr supply line and under slab main 6/5/2001 11:23:49 AM
|
Telephone call | | | 4/13/2001 | | DONE |
|
|
|
left mess that permit is ready
|
Issue permit | | | 4/13/2001 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 4/9/2001 | | 4/12/2001 | | DONE |
|
|
|
4/12/2001 09:48:06 SLR - activity updated through activity FIRA22 from case FIR01-00199.
|
Sprinkler Plan Check | | | 4/12/2001 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/12/2001 | | PASS |
|
|
|
|
Inspection Record Card- Fire | 4/12/2001 | | 4/12/2001 | | DONE |
|
|
|
|
Application received | | | 4/9/2001 | | |
|
|
|
|