INSP-Final Inspection | 12/28/2001 | 12/28/2001 | 12/28/2001 | A | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 12/28/2001 10:01:23 AM
|
DOC - Permit Finaled | 12/28/2001 | 12/28/2001 | 12/28/2001 | A | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 12/28/2001 10:01:32 AM
|
INSP-Sprinkler Rough-in/Hydro | 11/8/2001 | 11/8/2001 | 11/8/2001 | A | PART |
Rick Jackson
|
|
|
Added by Inspector: 409 On 11/8/2001 8:27:54 AM 24 hour air test okay
|
INSP-Sprinkler Rough-in/Hydro | 11/2/2001 | 11/2/2001 | 11/2/2001 | P | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 11/2/2001 1:54:36 PM hydro and r/i okay
|
Telephone call | | | 6/26/2001 | | DONE |
|
|
|
called resubmittal ready no fee
|
Issue permit | | | 6/26/2001 | | DONE |
|
|
|
picked up
|
INSP-Conference | 4/18/2001 | 4/19/2001 | 4/19/2001 | P | PART |
Rick Jackson
|
|
|
Rick ###-#### discussed locations of the required three standpipe locations in the horizontal exit 4/19/2001 2:51:33 PM
|
Inspection Record Card- Fire | 4/16/2001 | | 4/16/2001 | | DONE |
|
|
|
|
Telephone call | | | 4/16/2001 | | DONE |
|
|
|
left mess that permit is ready
|
Issue and Print Permit | | | 4/16/2001 | | DONE |
|
|
|
|
Application received | | | 4/13/2001 | | |
|
|
|
|
Plan assigned to (Bill) | 4/13/2001 | | 4/13/2001 | | DONE |
|
|
|
4/13/2001 17:51:04 SLR - activity updated through activity FIRA22 from case FIR01-00265.
|
Sprinkler Plan Check | | | 4/13/2001 | | FAIL |
|
|
|
Phoned revisions/additional info required to contractor (Gregg Patrick) 4/13. Hold awaiting him to re-fax info back.
|
Alarm Plan Check | 4/13/2001 | | 4/13/2001 | | PASS |
|
|
|
Acceptable resubmittal info received.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/13/2001 | | PASS |
|
|
|
|