INSP-Final Inspection | 1/22/2002 | 1/22/2002 | 1/22/2002 | P | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 1/22/2002 2:14:38 PM System finaled
|
DOC - Permit Finaled | 1/22/2002 | 1/22/2002 | 1/22/2002 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 1/22/2002 2:14:45 PM
|
INSP-Final Inspection | 8/29/2001 | 8/30/2001 | 8/30/2001 | A | PART |
Joe Tawney
|
|
|
Spklr tested Ok. Need decision from FD on tamper valves 8/30/2001 2:02:59 PM
|
INSP-Sprinkler Rough-in/Hydro | 8/29/2001 | 8/29/2001 | 8/29/2001 | P | PART |
Joe Tawney
|
|
|
Added by Inspector: 406 On 8/29/2001 4:57:52 PM Spklr rough was done 6/19/01 and was OK
|
INSP-Sprinkler Rough-in | 6/19/2001 | 6/19/2001 | 6/19/2001 | P | PASS |
Joe Tawney
|
|
|
Added by Inspector: 406 On 6/19/2001 4:28:27 PM OK to cover after installing one missed head on 1st floor
|
Issue permit | | | 5/4/2001 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/1/2001 | | 5/1/2001 | | DONE |
|
|
|
|
Telephone call | | | 5/1/2001 | | DONE |
|
|
|
left mess that permit is ready
|
Plan assigned to (Bill) | 4/23/2001 | | 4/30/2001 | | DONE |
|
|
|
4/30/2001 14:37:23 JWA - activity updated through activity FIRA22 from case FIR01-00276.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/30/2001 | | DONE |
Bill Alexander
|
|
|
|
Application received | | | 4/23/2001 | | PASS |
Bill Alexander
|
|
|
|
Sprinkler Plan Check | 4/23/1998 | | 4/27/1998 | | PASS |
Bill Alexander
|
|
|
With conditions of verifications by field inspector. Reference review notes.
|
Case Summary | | | | | DONE |
|
|
|
|