Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberFIR01-00281
StatusFinaled
Name SIMPLEX
Site Address 10215 W EMERALD ST
Project NameALM-EMERALD RESEARCH (C)
Customer Number 
ePlanReview 
Description
CRICKET COMMUNICATIONS - To replace the existing building FA control panel and install a fire alarm releasing panel for a new preaction system within Cricket Communications. The new building alarm panel will provide offsite monitoring of the existing building sprinkler system, an existing preaction sprinkler system in Fiber Pipe tenant area, duct detectors and the new preaction sprinkler system and three new FM200 special extinguishing systems being installed in Cricket Communications, and full a/v alarm annunciation within Cricket Communications tenant space. NOTE: this review does not include the design/installation/operation of the FM-200 systems, as they are not required by Code; the Fire Inspector will not witness acceptance tests or approve the installation of the FM-200 systems.
The Building permit (BLD01-00369) is to construct a 6,796 sq.ft. office with telephone switch room/shipping & receiving room/transmission room/power room, and exterior 19' x 25' exterior 8 ft. high chain link fence to contain glycol dry cooler units and a emergency power unit with above ground fuel tank. Interior work to include, construction of a one-hour tenant demising wall, a one-hour occupancy separation wall and ceiling for required separation of battery room, construction of noncombustible partitions to create switching room, transmission room, shipping and receiving area, small conference room, control room, and office areas, there will be a 3,380 sq ft administrative office located at the front that will remain unfinished a separate permit will be required to finish this area, installation of new exterior door and landing, the installation of suspended ceiling tiles and gypboard ceilings, concrete pad for emergency generator and glycol coolers.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/8/20021/8/20021/8/2002APASS
DetailsTroy Cobbley
Added by Inspector: 430 On 1/8/2002 8:46:58 AM Finaled by 406
DOC - Permit Finaled1/8/20021/8/20021/8/2002APASS
DetailsTroy Cobbley
Finaled by inspector at 1/8/2002 8:47:06 AM
INSP-Alarm Testing6/15/20016/15/20016/15/2001AFAIL
DetailsJoe Tawney
Added by Inspector: 406 On 6/15/2001 10:48:42 AM Reinsp Fail As built drawings of alarm system
INSP-Final Inspection6/8/20016/12/20016/12/2001APART
DetailsJoe Tawney
###-#### delila Completed rough in and verified components. To be tested later 6/12/2001 6:18:45 PM
Plan assigned to (SAM)4/26/2001 6/6/2001 DONE
6/6/2001 11:26:19 SLR - activity updated through activity FIRA22 from case FIR01-00281.
Alarm Plan Check  6/6/2001 PASS
3rd submittal.
PLANS/APPL TAKEN TO FRONT DESK  6/6/2001 PASS
Inspection Record Card- Fire6/6/2001 6/6/2001 DONE
Issue permit  6/6/2001 DONE
Alarm Plan Check  5/25/2001 FAIL
Resubmittal. Replacement of existing building FACP indicated. Plans are incomplete. REview comments faxed to, and discussed with, Troy Cobbley, Simplex.
Application received  4/26/2001  
Alarm Plan Check  4/26/2001 FAIL
Phoned contractor (Simplex) with comments; he plans to do a new submittal replacing the building FAC panel and revising plans for the Preaction detection system. He requested that I discard these plans and wait for the next re-submittal.