Case Summary | | | 7/26/2004 | | DONE |
|
|
|
|
INSP-Final Inspection | 10/1/2001 | 10/1/2001 | 10/1/2001 | P | PASS |
Joe Tawney
|
|
|
OK for permanent occup. One strobe to be added in corr. 10/1/2001 3:04:33 PM
|
DOC - Permit Finaled | 10/1/2001 | 10/1/2001 | 10/1/2001 | P | PASS |
Joe Tawney
|
|
|
Finaled by inspector at 10/1/2001 3:10:18 PM
|
Override - Parcel Holds | | | 10/1/2001 | | |
|
|
|
|
Inspection Record Card- Fire | 9/4/2001 | | 9/4/2001 | | DONE |
|
|
|
|
Telephone call | | | 9/4/2001 | | DONE |
|
|
|
|
Issue permit | | | 9/4/2001 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 5/3/2001 | | 8/31/2001 | | DONE |
|
|
|
8/31/2001 18:13:09 SLR - activity updated through activity FIRA22 from case FIR01-00307.
|
Alarm Plan Check | 8/31/2001 | | 8/31/2001 | | PASS |
|
|
|
Revised battery calcualtions resubmitted 8/31; resubmitted plans received 8/21/01. Review of revised interim plans done 5/23/01 to allow TOC permit.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/31/2001 | | PASS |
|
|
|
|
Alarm Plan Check | | | 5/10/2001 | | FAIL |
|
|
|
Plans are incomplete. Review faxed to Simplex Grinnel, Roger Adams.
|
Application received | | | 5/3/2001 | | |
|
|
|
|