Permit Information
Permit NumberFIR01-00316
StatusFinaled
Name SIMPLEX
Site Address 205 N 10TH ST
Project NameEMPIRE BLDG-CORE AREAS
Customer Number 
ePlanReview 
Description
U.S. Bank/Empire Building - To add required sprinkler monitoring of a new dry pipe sprinkler system installed in the attic of the US Bank side of the Empire Building. To be connected to the existing FAC panel in US Bank building area, for which plans have been approved to interconnect it with the new FAC panel in the Empire Building (see FIR01-00067).
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary  7/27/2004 DONE
INSP-Final Inspection6/5/20016/8/20016/8/2001APASS
DetailsRick Jackson
Deliah ###-####
DOC - Permit Finaled6/8/20016/8/20016/8/2001APASS
DetailsRick Jackson
Finaled by inspector at 6/8/2001 9:06:51 AM
INSP-Final Inspection5/31/20016/4/20016/4/2001ANR
DetailsRick Jackson
###-#### need plans 6/4/2001 8:30:55 AM
Inspection Record Card- Fire5/10/2001 5/10/2001 DONE
Telephone call  5/10/2001 DONE
called permit ready
Issue and Print Permit  5/10/2001 DONE
Application received  5/9/2001  
Plans submitted 5/2/01 as a RE-submittal on FIR01-00067 but that permit has been ISSUED. Therefore created a New permit for this submittal on 5/9/01.SLR/AML
Plan assigned to (SAM)5/9/2001 5/9/2001 DONE
5/9/2001 16:39:26 SLR - activity updated through activity FIRA22 from case FIR01-00316.
Alarm Plan Check  5/9/2001 PASS
PLANS/APPL TAKEN TO FRONT DESK  5/9/2001 PASS