INSP-Final Inspection | 10/26/2001 | 10/26/2001 | 10/26/2001 | A | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 10/26/2001 8:07:48 AM Shell sprinkler system OK for sign off
|
DOC - Permit Finaled | 10/26/2001 | 10/26/2001 | 10/26/2001 | A | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 10/26/2001 8:08:02 AM
|
INSP-Sprinkler Rough-in/Hydro | 9/28/2001 | 10/1/2001 | 10/1/2001 | P | PART |
Joe Tawney
|
|
|
Rough-in OK. Above ground hydro OK. Eq brace to be added in two locations. One upright to be added at mech. Check coverage at draft stops during TI 10/1/2001 4:36:02 PM
|
INSP-Supply line flush | 9/5/2001 | 9/5/2001 | 9/5/2001 | | PART |
Joe Tawney
|
|
|
Ok on underground hydro test. Need copy of test certificate 9/5/2001 4:38:26 PM
|
Issue and Print Permit | | | 6/19/2001 | | DONE |
|
|
|
|
Telephone call | | | 6/18/2001 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 6/18/2001 | | 6/18/2001 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 6/6/2001 | | 6/18/2001 | | DONE |
|
|
|
6/18/2001 09:34:21 JWA - activity updated through activity FIRA22 from case FIR01-00350.
|
Sprinkler Plan Check | 6/6/2001 | | 6/18/2001 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/18/2001 | | DONE |
Bill Alexander
|
|
|
|
Application received | | | 6/6/2001 | | PASS |
Bill Alexander
|
|
|
|
Case Summary | | | | | DONE |
|
|
|
|