DOC - Permit Finaled | 12/12/2001 | 12/12/2001 | 12/12/2001 | P | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 12/12/2001 2:10:58 PM
|
INSP-Supply line flush | 10/22/2001 | 10/22/2001 | 10/22/2001 | P | PASS |
Troy Cobbley
|
|
|
Underground flush Ok. Underground hydro OK. 10/24/2001 8:27:49 AM
|
INSP-Sprinkler Rough-in/Hydro | 10/16/2001 | 10/17/2001 | 10/16/2001 | P | CANC |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 10/16/2001 at 15:43:34. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 10/16/2001 at 16:25:05.
|
INSP-Sprinkler Rough-in/Hydro | 10/4/2001 | 10/5/2001 | 10/5/2001 | A | CANC |
Joe Tawney
|
|
|
cancelled by contractor 10/5/2001 1:00:12 PM
|
INSP-Supply line flush | 10/4/2001 | 10/5/2001 | 10/5/2001 | A | CANC |
Joe Tawney
|
|
|
cancelled by contractor 10/5/2001 1:00:29 PM
|
INSP-Sprinkler Rough-in/Hydro | 6/19/2001 | 6/20/2001 | 6/20/2001 | P | PART |
Joe Tawney
|
|
|
OK to cover spklr supply line 6/20/2001 3:25:51 PM
|
Inspection Record Card- Fire | 6/15/2001 | | 6/15/2001 | | DONE |
|
|
|
|
Telephone call | | | 6/15/2001 | | DONE |
|
|
|
|
Issue and Print Permit | | | 6/15/2001 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 6/14/2001 | | 6/15/2001 | | DONE |
|
|
|
6/15/2001 08:41:21 JWA - activity updated through activity FIRA22 from case FIR01-00358.
|
Sprinkler Plan Check | 6/14/2001 | | 6/15/2001 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/15/2001 | | DONE |
Bill Alexander
|
|
|
|
Application received | | | 6/14/2001 | | |
|
|
|
|
Case Summary | | | | | DONE |
|
|
|
|