DOC - Permit Finaled | 3/26/2002 | 3/26/2002 | 3/26/2002 | P | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 3/26/2002 11:46:12 AM
|
INSP-Sprinkler Rough-in/Hydro | 3/26/2002 | 3/26/2002 | 3/26/2002 | A | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 3/26/2002 11:44:56 AM
|
INSP-Final Inspection | 1/16/2002 | 1/16/2002 | 1/16/2002 | P | PART |
Rick Jackson
|
|
|
Added by Inspector: 409 On 1/16/2002 1:59:06 PM okay on this permit only
|
Issue and Print Permit | | | 12/28/2001 | | DONE |
|
|
|
|
Sprinkler Plan Check | 12/20/2001 | | 12/27/2001 | | DONE |
Bill Alexander
|
|
|
Required resubmittal for items not addressed or items which required corrections in 07/09/2001 resubmittal review, i.e., Standpipe installation detailed, hangers, unit detail piping correlating with floor plans, heads cold soldered, heads missing under stairs, heads overspaced or not covering all areas, etc.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/27/2001 | | DONE |
Bill Alexander
|
|
|
|
Inspection Record Card- Fire | 12/27/2001 | | 12/27/2001 | | DONE |
|
|
|
|
Telephone call | | | 12/27/2001 | | DONE |
|
|
|
left mess that permit is ready
|
INSP-Final Inspection | 12/24/2001 | 12/26/2001 | 12/26/2001 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/24/2001 at 08:14:46. Contact: ###-####. need occupancy separation heads complete; esctcheons; need calc sticker; bell sticker and test alarms 12/26/2001 1:23:49 PM
|
INSP-Sprinkler Rough-in/Hydro | 12/26/2001 | 12/26/2001 | 12/26/2001 | P | PART |
Rick Jackson
|
|
|
Added by Inspector: 409 On 12/26/2001 1:24:10 PM hydro okay on dry standpipe
|
INSP-Sprinkler Rough-in/Hydro | 10/2/2001 | 10/2/2001 | 10/2/2001 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/02/2001 at 10:18:17. Contact: ###-####. tenting not complete on east side; okay to cover other rooms 10/2/2001 2:43:07 PM
|
INSP-Sprinkler Rough-in/Hydro | 9/28/2001 | 9/28/2001 | 9/28/2001 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 09/28/2001 at 08:58:42. Contact: ###-####. batting for attic piping not complete; straps on west side 9/28/2001 2:49:38 PM
|
INSP-Sprinkler Rough-in/Hydro | 9/26/2001 | 9/27/2001 | 9/27/2001 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 09/26/2001 at 14:09:50. Contact: ###-####. straps throughout; tenting required 9/27/2001 11:13:35 AM
|
INSP-Sprinkler Rough-in/Hydro | 9/25/2001 | 9/26/2001 | 9/26/2001 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 09/25/2001 at 14:28:13. Contact: ###-####. hydro okay on aprtial part of system 9/26/2001 3:42:07 PM
|
INSP-Supply line flush | 9/12/2001 | 9/12/2001 | 9/12/2001 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 09/12/2001 at 10:59:09. Contact: ###-####.
|
INSP-Conference | 9/10/2001 | 9/10/2001 | 9/10/2001 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 09/10/2001 at 09:14:50. Contact: ###-####. discussed obstructions with Terry 9/10/2001 11:21:00 AM
|
INSP-Sprinkler Rough-in/Hydro | 8/31/2001 | 8/31/2001 | 8/31/2001 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 08/31/2001 at 07:40:18. Contact: ###-####. hydro for sidewall okay 8/31/2001 11:23:33 AM
|
INSP-Sprinkler Rough-in/Hydro | 8/23/2001 | 8/24/2001 | 8/24/2001 | P | PART |
Joe Tawney
|
|
|
OK on above ground hydro test for North half of bldg. Spklr rough in of North half. Address coverage along soffits installed for HVAC. Provide coverage info for side wall heads at separation walls. Do not cover lines requiring tenting. 8/24/2001 5:54:00 PM
|
Inspection Record Card- Fire | 7/11/2001 | | 7/11/2001 | | DONE |
|
|
|
|
Telephone call | | | 7/11/2001 | | DONE |
|
|
|
|
Issue permit | | | 7/11/2001 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 6/15/2001 | | 7/11/2001 | | DONE |
|
|
|
7/11/2001 08:10:14 JWA - activity updated through activity FIRA22 from case FIR01-00364.
|
Sprinkler Plan Check | 7/3/2001 | | 7/11/2001 | | PASS |
Bill Alexander
|
|
|
Requires resubmittal of Standpipes and areas lacking coverage.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/11/2001 | | DONE |
Bill Alexander
|
|
|
|
Telephone call | | | 6/26/2001 | | DONE |
|
|
|
called permit failed
|
Telephone call | | | 6/25/2001 | | DONE |
|
|
|
Faxed copy of failed review with requirements to Commercial Fire 3:00pm, 06/25/01.
|
Miscellaneous action | | | 6/25/2001 | | DONE |
|
|
|
Took 3 plans to front desk for calling and to return to submitter.
|
Sprinkler Plan Check | 6/18/2001 | | 6/22/2001 | | FAIL |
Bill Alexander
|
|
|
Lack full standpipe system. Lack parking garage protection. Lack detailed plans &/or unreadable.
|
Application received | | | 6/15/2001 | | DONE |
Bill Alexander
|
|
|
|
Case Summary | | | | | DONE |
|
|
|
|
Case Summary | | | | | DONE |
|
|
|
|