DOC - Permit Finaled | 12/17/2001 | 12/17/2001 | 12/17/2001 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 12/17/2001 4:11:06 PM
|
INSP-Final Inspection | 10/22/2001 | 10/22/2001 | 10/22/2001 | P | PASS |
Troy Cobbley
|
|
|
OK for perm occ 10/25/2001 8:17:59 AM
|
INSP-Final Inspection | 10/17/2001 | 10/18/2001 | 10/18/2001 | A | CANC |
Troy Cobbley
|
|
|
Contractor said to cancel 10/18/2001 3:53:49 PM
|
INSP-Sprinkler Rough-in/Hydro | 7/13/2001 | 7/13/2001 | 7/13/2001 | P | PART |
Joe Tawney
|
|
|
OK on spklr rough in 7/13/2001 2:02:39 PM
|
Issue and Print Permit | | | 7/13/2001 | | DONE |
|
|
|
|
Telephone call | | | 7/12/2001 | | DONE |
|
|
|
###-#### permit ready
|
Inspection Record Card- Fire | 7/12/2001 | | 7/12/2001 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 6/26/2001 | | 7/12/2001 | | DONE |
|
|
|
7/12/2001 14:07:49 JWA - activity updated through activity FIRA22 from case FIR01-00379.
|
Sprinkler Plan Check | 7/10/2001 | | 7/12/2001 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/12/2001 | | DONE |
Bill Alexander
|
|
|
|
Sprinkler Plan Check | 7/6/2001 | | 6/27/2001 | | FAIL |
Bill Alexander
|
|
|
Water supply taken at the wrong pont. Exposed riser without protection, calcs are not correct.
|
Application received | | | 6/26/2001 | | PASS |
Bill Alexander
|
|
|
|
Case Summary | | | | | DONE |
|
|
|
|