INSP-Final Inspection | 12/4/2001 | 12/4/2001 | 12/4/2001 | A | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 12/4/2001 11:35:33 AM Over head sprinkler system finaled
|
DOC - Permit Finaled | 12/4/2001 | 12/4/2001 | 12/4/2001 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 12/4/2001 11:35:41 AM
|
INSP-Sprinkler Rough-in/Hydro | 11/16/2001 | 11/19/2001 | 11/19/2001 | A | PASS |
Troy Cobbley
|
|
|
Above ground hydro test OK 11/20/2001 12:50:32 PM
|
INSP-Sprinkler Rough-in/Hydro | 11/15/2001 | 11/16/2001 | 11/16/2001 | P | CANC |
Troy Cobbley
|
|
|
canceled by the contractor 11/16/2001 3:15:12 PM
|
INSP-Sprinkler Rough-in/Hydro | 11/13/2001 | 11/13/2001 | 11/13/2001 | A | PART |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 11/13/2001 10:49:20 AM Install EQ at top of riser, add branchlines along column lines 3 and 2, verify sprinkler head temps at heaters, provide flex. couplings above mezzanine
|
INSP-Sprinkler Rough-in | 11/6/2001 | 11/6/2001 | 11/6/2001 | A | PART |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 11/6/2001 9:48:22 AM East office area OK for cover.
|
FIR-Aging Inspection | 10/24/2001 | 10/24/2001 | 10/24/2001 | | NR |
Troy Cobbley
|
|
|
work in progress 10/25/2001 8:18:20 AM
|
Inspection Record Card- Fire | 7/25/2001 | | 7/25/2001 | | DONE |
|
|
|
|
Telephone call | | | 7/25/2001 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/25/2001 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 7/2/2001 | | 7/24/2001 | | DONE |
|
|
|
7/24/2001 15:52:14 JWA - activity updated through activity FIRA22 from case FIR01-00386.
|
Sprinkler Plan Check | 7/3/2001 | | 7/24/2001 | | PASS |
Bill Alexander
|
|
|
OVERHEAD ONLY. SPRINKLER PLANS DELAYED DUE TO RECEIPT BEFORE BUILDING REVIEW APPROVED.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/24/2001 | | DONE |
Bill Alexander
|
|
|
|
Telephone call | | | 7/11/2001 | | DONE |
|
|
|
Faxed NO Review to DeBest.
|
Application received | | | 7/2/2001 | | |
|
|
|
|
Case Summary | | | | | DONE |
|
|
|
|
Case Summary | | | | | DONE |
|
|
|
|