Permit Information
Permit NumberFIR01-00396
StatusFinaled
Name NATIONAL FIRE CONTROL
Site Address 7699 W SPECTRUM ST
Project NameSPR HILTON GARDEN INN OH
Customer Number 
ePlanReview 
Description
HILTON GARDEN INN * This building consists of 3 sections. Section 1-West (39 units) BLD01-00729, Section 2-Middle (34 units) BLD01-00736 and Section 3-East (64 units) BLD01-00737. Two (2), two hour area separation walls divide this four story hotel into three separate buildings under the Building Code, (no consideration provided under the Fire Code). Section 1 consists of some assembly rooms. Section 2 consists of a restaurant and pool area. An area separation wall at Grid Line 15 is being used as a HORIZONTAL EXIT. Standpipes will be required per UFC Section 1004. All fire sprinkler work is per the plans and attached comment list which shall meet the minimum requirements of NFPA 13-1999, 13R-1999, 72-1999, 14-2000. All as regulated through the UFC, by the Fire Department. NOTE: This building is fully fire sprinklered for story increase. Underground fire service line was installed under FIR01-00369. *JWA*
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/12/20028/12/20028/12/2002APASS
DetailsTroy Cobbley
finaled
DOC - Permit Finaled8/12/20028/12/20028/12/2002PPASS
DetailsTroy Cobbley
Finaled by inspector at 8/12/2002 11:48:17 AM
INSP-Final Inspection8/12/20028/12/20028/12/2002APASS
DetailsTroy Cobbley
finaled
DOC - Permit Finaled8/12/20028/12/20028/12/2002PPASS
DetailsTroy Cobbley
Finaled by inspector at 8/12/2002 11:48:17 AM
INSP-Final Inspection7/10/20027/11/20027/11/2002PCANC
DetailsTroy Cobbley
not all of the work is complete (windows changed out) 7/11/2002 2:57:02 PM
INSP-Sprinkler Rough-in/Hydro6/17/20026/18/20026/18/2002AFAIL
DetailsTroy Cobbley
provide spare sprinkler heads per note 16, provide canopies for pendants, provide additional hangers in conference rooms, provide canopies and ceiling tile in all elevator lobbies, tag risers, provide approval for the window sprinklers and meet requirements 6/18/2002 12:27:11 PM
INSP-Final Inspection6/18/20026/18/20026/18/2002PPART
DetailsTroy Cobbley
fire sprinkler system given temp per Dave Miller for the window sprinklers
INSP-Sprinkler Rough-in/Hydro6/14/20026/17/20026/17/2002APART
DetailsTroy Cobbley
Hydro test of both FDCs and the 1st floor dry system OK. 6/17/2002 3:46:37 PM
Override - Parcel Holds  6/17/2002  
Override - Parcel Holds  6/14/2002  
INSP-Sprinkler Rough-in/Hydro3/28/20023/29/20023/29/2002APASS
DetailsTroy Cobbley
4th floor hydro test OK, OK to cover pool area and small south side dry system 3/29/2002 3:04:14 PM
Telephone call  3/7/2002 DONE
permit ready
Issue permit  3/7/2002 DONE
Sprinkler Plan Check3/5/2002 3/6/2002 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  3/6/2002 DONE
DetailsBill Alexander
Sprinkler Plan Check2/8/2002 2/20/2002 FAIL
DetailsBill Alexander
Added corridor window sprinkler protection columns N and 14, and modified dry system over conference 109 entry, columns 5 to 7 and north of R, plan sheets FP-2.

Failed due to many questions on installation of window sprinklers.
Miscellaneous action  2/20/2002 FAIL
Plan taken to front desk for calling and return of deficient plans.
Telephone call  2/20/2002 DONE
called, plans failed, need to pick up and resubmit
INSP-Sprinkler Rough-in2/11/20022/11/20022/11/2002PPART
DetailsTroy Cobbley
Added by Inspector: 430 On 2/11/2002 2:42:54 PM 2nd floor rough-in OK. OK to cover
INSP-Sprinkler Rough-in1/31/20022/1/20022/1/2002APART
DetailsTroy Cobbley
3rd floor rough-in OK 2/1/2002 8:24:06 AM
INSP-Sprinkler Rough-in1/31/20022/1/20022/1/2002PCANC
DetailsTroy Cobbley
duplicate inspection 1/31/2002 4:25:41 PM
FIR-Aging Inspection2/1/20022/1/20022/1/2002 NR
DetailsTroy Cobbley
work in progress 2/1/2002 11:39:27 AM
INSP-Sprinkler Rough-in/Hydro1/25/20021/25/20021/25/2002APART
DetailsTroy Cobbley
Added by Inspector: 430 On 1/25/2002 11:07:08 AM Attic dry system rough-in Ok now that difficiencies are corrected. 4th floor wet system rough-in OK. Tenting/boxes over some 4th floor pipe to be inspected later
INSP-Sprinkler Rough-in/Hydro1/22/20021/23/20021/23/2002PFAIL
DetailsTroy Cobbley
Attic dry system hydro failed 1/23/2002 3:33:31 PM
INSP-Sprinkler Rough-in/Hydro1/23/20021/23/20021/23/2002PPART
DetailsTroy Cobbley
Added by Inspector: 430 On 1/23/2002 3:36:00 PM Rough-in OK for the attic system. Contractor to relocate two upright sprinkler heads at east end. Left notice with General Contractor that draft stops and sheer walls need to be installed to separate sprinkler heads that are too close down mechanical corridor
PLANS/APPL TAKEN TO FRONT DESK  12/27/2001 DONE
DetailsBill Alexander
Sprinkler Plan Check12/19/2001 12/27/2001 PASS
DetailsBill Alexander
Attic system modifications.
Issue permit  12/27/2001 DONE
Telephone call  12/26/2001 DONE
Telephone call  10/3/2001 DONE
Issue permit  10/3/2001 DONE
Sprinkler Plan Check9/27/2001 10/3/2001 PASS
DetailsBill Alexander
Final approval on original design.
PLANS/APPL TAKEN TO FRONT DESK  10/3/2001 DONE
DetailsBill Alexander
Telephone call  9/24/2001 DONE
reminder call
Inspection Record Card- Fire7/19/2001 7/19/2001 DONE
Sprinkler Plan Check7/12/2001 7/19/2001 PASS
DetailsBill Alexander
Partial approval only. Need resubmittal verification of misc. items.
PLANS/APPL TAKEN TO FRONT DESK  7/19/2001 DONE
DetailsBill Alexander
For Partial Approval
Plan assigned to (Bill)7/12/2001 7/13/2001 DONE
7/13/2001 10:40:26 JWA - activity updated through activity FIRA22 from case FIR01-00369.
Application received  7/12/2001 PASS
DetailsBill Alexander
Case Summary    DONE
Called Nick Anderson and went over plan problems (irregularities).
Case Summary    DONE
Case Summary    DONE